Case study:Resilient River: Difference between revisions
No edit summary |
No edit summary |
||
(12 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
{{Case study status | {{Case study status | ||
|Approval status= | |Approval status=Approved | ||
}} | }} | ||
{{Location | {{Location | ||
Line 7: | Line 7: | ||
{{Project overview | {{Project overview | ||
|Status=Complete | |Status=Complete | ||
|Project web site url= | |Project web site url=neneriverstrust.org/projects/resilient-river-project/ | ||
|Themes=Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Hydromorphology, Water quality, Urban | |Themes=Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Hydromorphology, Water quality, Urban | ||
|Country=England | |Country=England | ||
|Main contact forename=Viktor | |Main contact forename=Viktor | ||
|Main contact surname=Tzikas | |Main contact surname=Tzikas | ||
|Contact organisation url= | |Contact organisation url=neneriverstrust.org/ | ||
|Multi-site=Yes | |Multi-site=Yes | ||
|Project summary=An initiative of the Nenescape Landscape Partnership the Resilient River project is funded by the Environment Agency & National Lottery Heritage Fund. The primary aim of the project is to enhance, restore and protect the backchannels and backwaters of the Nene Valley through efficient partnership working and best practice. | |Project summary=An initiative of the Nenescape Landscape Partnership the Resilient River project is funded by the Environment Agency & National Lottery Heritage Fund. The primary aim of the project is to enhance, restore and protect the backchannels and backwaters of the Nene Valley through efficient partnership working and best practice. | ||
Line 22: | Line 22: | ||
}} | }} | ||
{{Image gallery}} | {{Image gallery}} | ||
{{Case study image | |||
|File name=57321544 2710085612340222 8536128319752503296 n.jpg | |||
|Caption=Barnwell Backchannel Interpretation Panel | |||
}} | |||
{{Case study image | |||
|File name=P1000330.JPG | |||
|Caption=Hinge & Pinned Tree Barnwell | |||
}} | |||
{{Case study image | |||
|File name=P1000363.JPG | |||
|Caption=Natural Erosion Protection Barnwell | |||
}} | |||
{{Case study image | |||
|File name=88029423 2702649713292157 5396038696984117248 n.jpg | |||
|Caption=Volunteer tree planting Ailsworth | |||
}} | |||
{{Case study image | |||
|File name=Regrade 042020.jpg | |||
|Caption=Whitemills Re-graded Banks Post works | |||
}} | |||
{{Case study image | |||
|File name=WMPre2300.JPG | |||
|Caption=Whitemills Re-graded Banks Pre works | |||
}} | |||
{{Case study image | |||
|File name=ELton 5854.jpg | |||
|Caption=Reinstated ford at Elton | |||
}} | |||
{{Case study image | |||
|File name=ELton4782.JPG | |||
|Caption=Elton Ford Pre works | |||
}} | |||
{{Image gallery end}} | {{Image gallery end}} | ||
{{Toggle button}} | {{Toggle button}} | ||
Line 32: | Line 64: | ||
|WFD water body name=Nene | |WFD water body name=Nene | ||
|Heavily modified water body=Yes | |Heavily modified water body=Yes | ||
|Site designation=EU - WFD protected area (drinking water, shellfish etc.) | |||
|Protected species present=Yes | |Protected species present=Yes | ||
|Invasive species present=Yes | |Invasive species present=Yes | ||
|Dominant hydrology=Artificially regulated, | |||
|Dominant substrate=Gravel, | |||
|River corridor land use=Improved/semi-improved grassland/pasture, | |||
}} | |||
{{Project background | |||
|Reach length directly affected=88000 | |||
|Project started=2017/09/01 | |||
|Works started=2018/03/01 | |||
|Total cost category=100 - 500 k€ | |||
|Funding sources=National Lottery Heritage Fund, Environment Agency, Environment Agency (Fisheries) Contribution of staff time (NWKCP, | |||
|Investigation and design cost category=10 - 50 k€ | |||
|Invst and design cost=21 | |||
|Investigation and design Lead organisation=River Nene Regional Park | |||
|Stakeholder1 engagement cost category=1 - 10 k€ | |||
|Stakeholder engagement Lead organisation=River Nene Regional Park | |||
|Works1 and supervision cost category=100 - 500 k€ | |||
|Works and supervision Lead organisation=River Nene Regional Park | |||
|Post-project1 management and maintenance cost category=10 - 50 k€ | |||
|Post-project management and maintenance Lead organisation=River Nene Regional Park | |||
|Monitoring1 cost category=10 - 50 k€ | |||
|Monitoring Lead organisation=River Nene Regional Park | |||
}} | |||
{{Motivations | |||
|Hydromorphological quality elements=Navigation, | |||
|Physico-chemical quality elements=Specific synthetic pollutants, Specific non-synthetic pollutants, Nutrient concentrations, | |||
|Other motivation=Landscape enhancement, Bank erosion, Floodplain Connectivity | |||
}} | |||
{{Measures | |||
|Bank and bed modifications measure=Introduction of gravel, Floating vegetated bank structures, Bank reprofiling, Sensitive desilt, Tree planting, Introducing large woody debris, Soft erosion solutions, | |||
|Floodplain / River corridor=Livestock fencing, | |||
|Social measures=Interpretation boards, interacting with farmers, | |||
}} | }} | ||
{{Hydromorphological quality elements header}} | {{Hydromorphological quality elements header}} | ||
{{End table}} | {{End table}} | ||
Line 49: | Line 110: | ||
{{Monitoring documents end}} | {{Monitoring documents end}} | ||
{{Additional Documents}} | {{Additional Documents}} | ||
{{Case study documents | |||
|File name=Ailsworth FINALv2.pdf | |||
|Description=Ailsworth Backchannel Project | |||
}} | |||
{{Case study documents | |||
|File name=Barnwell FINALv2.pdf | |||
|Description=Barnwell Inner Backchannel Project | |||
}} | |||
{{Case study documents | |||
|File name=Elton FINALv2.pdf | |||
|Description=Elton Backchannel Project | |||
}} | |||
{{Case study documents | |||
|File name=Fotheringhay BW CS FINAL.pdf | |||
|Description=Fotheringhay Backwater Project | |||
}} | |||
{{Case study documents | |||
|File name=Nassington FINALv2.pdf | |||
|Description=Nassington Backchannel Project | |||
}} | |||
{{Case study documents | |||
|File name=Whitemills FINAL.pdf | |||
|Description=Whitemills Backchannel Project | |||
}} | |||
{{Case study documents | |||
|File name=Whitworths Mill Greening CS Final.pdf | |||
|Description=Whitworths Mill Greening Project | |||
}} | |||
{{Additional Documents end}} | {{Additional Documents end}} | ||
{{Additional links and references header}} | {{Additional links and references header}} |
Latest revision as of 09:21, 17 February 2023
Project overview
Status | Complete |
---|---|
Project web site | http://neneriverstrust.org/projects/resilient-river-project/ |
Themes | Environmental flows and water resources, Fisheries, Flood risk management, Habitat and biodiversity, Hydromorphology, Water quality, Urban |
Country | England |
Main contact forename | Viktor |
Main contact surname | Tzikas |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | http://neneriverstrust.org/ |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
An initiative of the Nenescape Landscape Partnership the Resilient River project is funded by the Environment Agency & National Lottery Heritage Fund. The primary aim of the project is to enhance, restore and protect the backchannels and backwaters of the Nene Valley through efficient partnership working and best practice.
The River Nene has been highly modified for both flood defence and navigation purposes, historically for industry and in recent times for leisure. This has however, had an impact on the potential for the river to act as an aquatic habitat. The main river, where navigable is much less favourable habitat than the backchannels (historically the main river before modification) for fish, invertebrates & other flora and fauna.
The Resilient River project is in place to connect habitats along the Nene Valley by restoring neglected/altered features, to improve biodiversity; protect, enhance and interpret heritage features; and improve resilience of water quality and supply in the face of population growth, urbanisation and climate change.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: River Nene Nature Improvement Area
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|