Case study:Cuckolds Haven Nature Area: Difference between revisions
No edit summary |
No edit summary |
||
Line 60: | Line 60: | ||
}} | }} | ||
{{Motivations | {{Motivations | ||
|Specific mitigation=Riparian development, | |Specific mitigation=Riparian development, | ||
|Other motivation=reduce | |Other motivation=reduce the fear of crime | ||
}} | }} | ||
{{Measures}} | {{Measures}} |
Revision as of 17:36, 31 August 2012
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Habitat and biodiversity, Social benefits |
Country | England |
Main contact forename | Toni |
Main contact surname | Scarr |
Main contact user ID | User:Ascarr |
Contact organisation | Environment Agency |
Contact organisation web site | http://www.environment-agency.gov.uk |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Previous site use/issues
• Nature area owned by LB Newham (little known/used by local people)
• No access for wheelchairs
• Limited access points adding to ‘fear of crime’
• Ecologically and historically valuable site but no information for site users reed buting have been seen in the reeds adjacent to the site
• Lack of seating areas within site for users/local school groups
Enhancements
• Enhanced planting within site including black poplars
• Creation of riverside seating/viewing area
• Provision of site wildlife and historical information boards
• New wheelchair friendly site entrance and access route
• Interpretation boards installed by just ecology
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | Cuckold's Haven |
---|---|
WFD water body codes | |
WFD (national) typology | Intertidal |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | Tidal |
Dominant substrate | Estuarine mud |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2004/10/01 |
Works started | |
Works completed | |
Project completed | 2006/03/31 |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Office of the Deputy Prime Minister’s (now DCLG) Sustainable Communities Fund |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Riparian development |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project | reduce the fear of crime |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information