Case study:Wensum River Restoration and Floodplain Enhancement: Difference between revisions

From RESTORE
Jump to navigation Jump to search
No edit summary
No edit summary
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
{{Case_study_status
{{Case study status
|Approval status=
|Approval status=Approved
   
   
   
 
 
   
      Draft
}}
}}
{{Location
{{Location
Line 20: Line 13:
|Contact organisation=Pensthorpe Conservation Trust Ltd
|Contact organisation=Pensthorpe Conservation Trust Ltd
|Multi-site=No
|Multi-site=No
|Project picture=Pensthorpe2.jpg
|Picture description=The project plan
|Project summary=Once the project is complete, approximately 2.5km of the River Wensum flowing through Pensthorpe will have restored ecological and hydrological functionality and provide habitats for a range of key chalk river species such as brown trout, white-clawed crayfish, Desmoulin’s whorl snail and water crowfoot. In addition to this, the adjoining floodplain will have significantly enhanced connectivity to the river and diffuse pollution from both Fakenham and adjoining agricultural land will have been mitigated.
|Project summary=Once the project is complete, approximately 2.5km of the River Wensum flowing through Pensthorpe will have restored ecological and hydrological functionality and provide habitats for a range of key chalk river species such as brown trout, white-clawed crayfish, Desmoulin’s whorl snail and water crowfoot. In addition to this, the adjoining floodplain will have significantly enhanced connectivity to the river and diffuse pollution from both Fakenham and adjoining agricultural land will have been mitigated.
}}
}}
{{Image_gallery}}
{{Image gallery}}
{{Case study image
|File name=Pensthorpe1.jpg
|Caption=A stretch of the river pre-restoration
}}
{{Image_gallery_end}}
{{Image_gallery_end}}
{{Toggle_button}}
{{Toggle_button}}
Line 30: Line 29:
}}
}}
{{Site
{{Site
|Name=
|WFD water body code=GB105034055881
   
|WFD water body name=Wensum US Norwich
   
|Heavily modified water body=No
     
|Protected species present=No
|WFD water body code=
|Invasive species present=No
     
|WFD (national) typology=
     
|WFD water body name=
     
|Pre-project morphology=
     
|Reference morphology=
     
|Heavily modified water body=
     
|Local site designation=
     
|Site designation=
     
|Protected species present=
     
|Invasive species present=
     
|Species=
     
|Dominant hydrology=
     
|Dominant substrate=
     
|River corridor land use=
     
|Average bankfull channel width category=
     
|Avrg bankfull channel width=
     
|Average bankfull channel depth category=
     
|Avrg1 bankfull channel depth=
     
|Mean discharge category=
     
|Mn discharge=
     
|Average channel gradient category=
     
|Avrg channel gradient=
     
}}
}}
{{Project background
{{Project background
|Project started=2012/07/01
|Project completed=2015/03/01
|Funding sources=Defra Catchment Restoration Fund
|Funding sources=Defra Catchment Restoration Fund
}}
}}
Line 97: Line 55:
}}
}}
{{Measures
{{Measures
|Bank and bed modifications measure=
|Bank and bed modifications measure=habitat improvements
   
|Floodplain / River corridor=Floodplain reconnection, Reedbed creation, Creation of wetland,
   
|Social measures=Community involvement
     
|Floodplain / River corridor=
     
|Planform / Channel pattern=
     
|Other technical measure=
     
|Management interventions=
     
|Social measures=
      Community involvement
|Wider stakeholder / citizen engagement=
     
}}
}}
{{Hydromorphological_quality_elements_header}}
{{Hydromorphological_quality_elements_header}}
Line 122: Line 67:
{{Other_responses_header}}
{{Other_responses_header}}
{{End_table}}
{{End_table}}
{{Monitoring_documents}}
{{Monitoring documents}}
{{Case study monitoring documents
|Monitoring document=ANG001 monitoring framework table.docx
|Description=RRC Monitoring table - Wensum
}}
{{Monitoring_documents_end}}
{{Monitoring_documents_end}}
{{Additional_Documents}}
{{Additional Documents}}
{{Case study documents
|File name=CRF010 Project Briefing Note - Pensthorpe.pdf
|Description=CRF Project briefing note - Wensum
}}
{{Additional_Documents_end}}
{{Additional_Documents_end}}
{{Additional_links_and_references_header}}
{{Additional_links_and_references_header}}

Latest revision as of 09:41, 1 June 2017

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 49' 35.06" N, 0° 52' 0.46" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Fisheries, Social benefits, Water quality
Country England
Main contact forename Tim
Main contact surname Nevard
Main contact user ID
Contact organisation Pensthorpe Conservation Trust Ltd
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The project plan

Project summary

Edit project overview to modify the project summary.


Once the project is complete, approximately 2.5km of the River Wensum flowing through Pensthorpe will have restored ecological and hydrological functionality and provide habitats for a range of key chalk river species such as brown trout, white-clawed crayfish, Desmoulin’s whorl snail and water crowfoot. In addition to this, the adjoining floodplain will have significantly enhanced connectivity to the river and diffuse pollution from both Fakenham and adjoining agricultural land will have been mitigated.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


A stretch of the river pre-restoration
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Anglian
River basin Broadland Rivers

Subcatchment

River name Wensum US Norwich
Area category 100 - 1000 km²
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 9898 m <br />0.098 km <br />9,800 cm <br />
Dominant geology Calcareous
Ecoregion Great Britain
Dominant land cover Arable and Horticulture
Waterbody ID GB105034055881



Other case studies in this subcatchment: Great Ryburgh End Restoration Scheme, Meander reinstatement on the River Wensum at the Ryburgh Loop, River Wensum Restoration, Reach 10 Lenwade, River Wensum Restoration, Reach 3a Costessey, River Wensum Restoration, Reach 9 Attlebridge, River rehabilitation on the River Wensum at Swanton Morley, Sculthorpe Moor Restoration Scheme, Wensum River Restoration and Floodplain Enhancement, Pensthorpe


Site

Name
WFD water body codes GB105034055881
WFD (national) typology
WFD water body name Wensum US Norwich
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2012/07/01
Works started
Works completed
Project completed 2015/03/01
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources Defra Catchment Restoration Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Pollution incident
Hydromorphology
Biology Fish, Invertebrates
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications habitat improvements
Floodplain / River corridor Floodplain reconnection, Reedbed creation, Creation of wetland
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Community involvement
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents




Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information