Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (April 1, 2007)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (May 1, 2007)
- Case study:Removal of the Fatou dam on the Beaume river + (July 1, 2007)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (August 1, 2007)
- Case study:Restoration of Vesselina River + (September 1, 2007)
- Case study:Removal of a pond weir in a tributary of Petersbach + (September 1, 2007)
- Case study:Sågarsfors + (September 2, 2007)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (October 1, 2007)
- Case study:Reppisch + (October 1, 2007)
- Case study:River Roding at Ray Lodge Park + (October 1, 2007)
- Case study:Glaisdale Beck diversion scheme + (October 10, 2007)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (November 1, 2007)
- Case study:Agreed definition of mobility area for the Adour + (January 1, 2008)
- Case study:Buiten Ooij + (January 1, 2008)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (January 1, 2008)
- Case study:Prologis Midpoint Park river restoration scheme + (January 1, 2008)
- Case study:´Restorations of River Nolån-Fishway in Forsa hydro power plant + (May 1, 2008)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (May 4, 2008)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (June 1, 2008)
- Case study:Removal of the Stalapos weir over the river Alagnon + (June 1, 2008)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (June 1, 2008)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (June 1, 2008)
- Case study:Marsh restoration on the Merlue + (July 1, 2008)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (September 1, 2008)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (September 1, 2008)
- Case study:Restoring the River Doquette to its original bed + (October 1, 2008)
- Case study:HPP Blanca + (January 1, 2009)
- Case study:Remeandering of the Mardereau stream at Sorigny + (March 1, 2009)
- Case study:Valtellina 2005 – New green system + (June 1, 2009)
- Case study:Rehabilitation of Benta stream + (June 1, 2009)
- Case study:Ecological Restoration of Vlascuta Lake + (August 1, 2009)
- Case study:Černý potok stream restoration scheme + (August 1, 2009)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (September 1, 2009)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (October 1, 2009)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (November 1, 2009)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (January 1, 2010)
- Case study:Restorations of Ritobäcken brook + (January 1, 2010)
- Case study:River Wandle Restoration Project + (January 1, 2010)
- Flood detention basin (HRB) Ickern-Mengede + (January 1, 2010)
- Case study:River Wandle: Butter Hill Phase 1 + (January 1, 2010)
- Case study:Water Framework Directive Funding + (January 1, 2010)
- Case study:Barnes Common + (February 1, 2010)
- Case study:Revitalisation of branches ’Boros Dráva and Drávakeresztúri’ + (May 1, 2010)
- Case study:Moreton Channel Gravel Reprofiling + (September 1, 2010)
- Case study:Matasaru Area - A new life on the river Arges + (December 1, 2010)
- Case study:Vindel River LIFE + (January 1, 2011)
- Case study:Lullingstone Castle + (January 1, 2011)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (January 1, 2011)
- Case study:Kleine Aa, traject Smalwater Noord + (January 1, 2011)
- Case study:Butter Hill Phase 2 + (January 1, 2011)
- Case study:Knock Burn low flow channel + (January 24, 2011)