Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Remeandering of the Drésine and of the Remoray stream + (December 1, 1999)
- Case study:Diversion of the River Nith + (April 1, 2000)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (January 1, 2002)
- Case study:Blanice River + (January 1, 2002)
- Case study:Boosting slivso + (November 1, 2002)
- Case study:The Holbina-Dunavat Restoration Project + (January 1, 2003)
- Case study:Sutcliffe Park + (April 1, 2003)
- Case study:Langonnet river + (January 1, 2004)
- Case study:Removal and opening of sluice gates on the Vence River + (January 1, 2004)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (January 1, 2004)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (February 1, 2004)
- Case study:The Fortuna Restoration Project + (March 1, 2004)
- Case study:Voorste Nete at Dessel + (April 1, 2004)
- Case study:River Cleddau + (July 1, 2004)
- Case study:Removal of the Cussy weir on the Maria stream + (October 1, 2004)
- Case study:Lek Bij Everdingen + (January 1, 2005)
- Case study:Aaijen- Removal of bank fixation + (January 1, 2005)
- Case study:London Olympics Parklands + (January 1, 2005)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (January 1, 2005)
- Case study:Long Preston Deeps Flood Plain Project + (January 1, 2005)
- Case study:Chowder Ness Managed Realignment Scheme + (February 1, 2005)
- Case study:Morava restoration project + (April 1, 2005)
- Case study:New Forest LIFE project + (June 1, 2005)
- Case study:Creation and restoration of a riparian zone + (August 1, 2005)
- Case study:Dam removal at Grönkullen, River Rolfsån + (August 1, 2005)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (September 1, 2005)
- Case study:River Darent at Hawley Manor + (September 24, 2005)
- Case study:Lower River Roding Regeneration Project + (October 1, 2005)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (January 1, 2006)
- Case study:River Avon at East Chisenbury + (January 1, 2006)
- Case study:River Glaven conservation group + (January 1, 2006)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (January 1, 2006)
- Case study:PROGETTO WETLAND - Volturno + (March 1, 2006)
- Case study:Ecological Restoration of Natural Lake Pochina + (May 1, 2006)
- Case study:Removal of five Lakes on the Val des Choues stream + (June 1, 2006)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (June 1, 2006)
- Case study:The Ciobarciu Wetland Project + (June 1, 2006)
- Case study:Improving the structure of the Lahn-patak in Hungary + (August 1, 2006)