Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rio Tepice urban restoration + (May 1, 1996)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (November 1, 1996)
- Case study:Kleblach-Side channel + (January 1, 1997)
- Case study:Greenwich Peninsula + (January 1, 1997)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (January 1, 1997)
- Case study:Rijkelse Bemden - River bed widening + (January 1, 1998)
- Case study:Regelsbrunner Aue + (January 1, 1998)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (June 1, 1998)
- Case study:Land acquisition on the banks of the Ouche River + (June 1, 1998)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (August 1, 1998)
- Case study:Refilling the meanders of the Colostre + (January 1, 1999)
- Case study:Vreugderijkerwaard side channel + (January 1, 1999)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (October 1, 1999)
- Case study:Remeandering of the Drésine and of the Remoray stream + (December 1, 1999)
- Case study:Diversion of the River Nith + (April 1, 2000)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (January 1, 2002)
- Case study:Blanice River + (January 1, 2002)
- Case study:Boosting slivso + (November 1, 2002)
- Case study:The Holbina-Dunavat Restoration Project + (January 1, 2003)
- Case study:Sutcliffe Park + (April 1, 2003)
- Case study:Langonnet river + (January 1, 2004)
- Case study:Removal and opening of sluice gates on the Vence River + (January 1, 2004)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (January 1, 2004)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (February 1, 2004)
- Case study:The Fortuna Restoration Project + (March 1, 2004)
- Case study:Voorste Nete at Dessel + (April 1, 2004)
- Case study:Restoration of the previous riverbed of the Dadon + (May 1, 2004)
- Case study:River Cleddau + (July 1, 2004)
- Case study:Removal of the Cussy weir on the Maria stream + (October 1, 2004)
- Case study:Lek Bij Everdingen + (January 1, 2005)
- Case study:Aaijen- Removal of bank fixation + (January 1, 2005)
- Case study:London Olympics Parklands + (January 1, 2005)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (January 1, 2005)
- Case study:Long Preston Deeps Flood Plain Project + (January 1, 2005)
- Case study:Chowder Ness Managed Realignment Scheme + (February 1, 2005)
- Case study:Morava restoration project + (April 1, 2005)
- Case study:New Forest LIFE project + (June 1, 2005)
- Case study:Creation and restoration of a riparian zone + (August 1, 2005)