Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Aaijen- Removal of bank fixation + (January 1, 2005)
- Case study:London Olympics Parklands + (January 1, 2005)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (January 1, 2005)
- Case study:Long Preston Deeps Flood Plain Project + (January 1, 2005)
- Case study:Chowder Ness Managed Realignment Scheme + (February 1, 2005)
- Case study:Morava restoration project + (April 1, 2005)
- Case study:New Forest LIFE project + (June 1, 2005)
- Case study:Creation and restoration of a riparian zone + (August 1, 2005)
- Case study:Dam removal at Grönkullen, River Rolfsån + (August 1, 2005)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (September 1, 2005)
- Case study:River Darent at Hawley Manor + (September 24, 2005)
- Case study:Lower River Roding Regeneration Project + (October 1, 2005)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (January 1, 2006)
- Case study:River Avon at East Chisenbury + (January 1, 2006)
- Case study:River Glaven conservation group + (January 1, 2006)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (January 1, 2006)
- Case study:PROGETTO WETLAND - Volturno + (March 1, 2006)
- Case study:Ecological Restoration of Natural Lake Pochina + (May 1, 2006)
- Case study:Removal of five Lakes on the Val des Choues stream + (June 1, 2006)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (June 1, 2006)
- Case study:The Ciobarciu Wetland Project + (June 1, 2006)
- Case study:Improving the structure of the Lahn-patak in Hungary + (August 1, 2006)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (September 1, 2006)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (November 2, 2006)
- Case study:Herinrichting beekdal Tongelreep + (January 1, 2007)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (April 1, 2007)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (May 1, 2007)
- Case study:Removal of the Fatou dam on the Beaume river + (July 1, 2007)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (August 1, 2007)
- Case study:Restoration of Vesselina River + (September 1, 2007)
- Case study:Removal of a pond weir in a tributary of Petersbach + (September 1, 2007)
- Case study:Sågarsfors + (September 2, 2007)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (October 1, 2007)
- Case study:Reppisch + (October 1, 2007)
- Case study:River Roding at Ray Lodge Park + (October 1, 2007)
- Case study:Glaisdale Beck diversion scheme + (October 10, 2007)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (November 1, 2007)
- Case study:Agreed definition of mobility area for the Adour + (January 1, 2008)
- Case study:Buiten Ooij + (January 1, 2008)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (January 1, 2008)
- Case study:Prologis Midpoint Park river restoration scheme + (January 1, 2008)
- Case study:´Restorations of River Nolån-Fishway in Forsa hydro power plant + (May 1, 2008)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (May 4, 2008)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (June 1, 2008)
- Case study:Removal of the Stalapos weir over the river Alagnon + (June 1, 2008)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (June 1, 2008)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (June 1, 2008)
- Case study:Marsh restoration on the Merlue + (July 1, 2008)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (September 1, 2008)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (September 1, 2008)
- Case study:Restoring the River Doquette to its original bed + (October 1, 2008)