Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (August 1, 2007)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (October 1, 2007)
- Case study:Removal of the Fatou dam on the Beaume river + (October 1, 2007)
- Case study:Glaisdale Beck diversion scheme + (October 10, 2007)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (November 1, 2007)
- Case study:Inchewan Burn Bed restoration + (November 1, 2007)
- Case study:Improving the structure of the Lahn-patak in Hungary + (November 1, 2007)
- Case study:Removal of a pond weir in a tributary of Petersbach + (November 1, 2007)
- Case study:Restoration of the river area of the section of Betzuca stream + (December 1, 2007)
- Case study:Environmental improvement project of the stream of Ruby + (December 1, 2007)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (December 31, 2007)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (January 1, 2008)
- Case study:Buenz + (January 1, 2008)
- Case study:River Roding at Ray Lodge Park + (January 1, 2008)
- Case study:Meades water garden regeneration project + (January 1, 2008)
- Case study:Room for the River + (January 1, 2008)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (January 1, 2008)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (March 1, 2008)
- Case study:Restoration of a section of Torrente de Can Sunyer passing through Martorelles + (March 1, 2008)
- Case study:Reppisch + (April 1, 2008)
- Case study:Restoration of Vesselina River + (April 1, 2008)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (April 1, 2008)
- Case study:Ems floodplain + (June 1, 2008)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (June 1, 2008)
- Case study:Vester Nebel Restoration + (July 1, 2008)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (August 3, 2008)
- Case study:Ladywell Fields (QUERCUS) + (September 1, 2008)
- Case study:Marsh restoration on the Merlue + (September 1, 2008)
- Case study:Restoring the River Doquette to its original bed + (October 1, 2008)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (December 1, 2008)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (December 1, 2008)
- Case study:Prologis Midpoint Park river restoration scheme + (December 1, 2008)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (January 1, 2009)
- Case study:River Avon at East Chisenbury + (January 1, 2009)
- Case study:Buiten Ooij + (January 1, 2009)
- Case study:Restoration of Vakkolankoski Torrent + (January 1, 2009)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (January 1, 2009)
- Case study:Ladywell Fields toeboarding + (January 1, 2009)
- Case study:Morden Hall Park Water Vole Habitat Enhancement + (January 1, 2009)
- Case study:Poulter Park + (January 1, 2009)
- Case study:Dagenham Brook de-silting + (January 1, 2009)
- Case study:Ferry Lane North drainage realignment + (January 1, 2009)
- Case study:Hackbridge Restoration + (January 1, 2009)
- Case study:New South Quarter - Croydon + (January 1, 2009)
- Case study:River Pinn Enhancement near Ickenham + (January 1, 2009)
- Case study:Morden Hall + (January 1, 2009)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (February 1, 2009)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (March 1, 2009)
- Case study:Remeandering of the Mardereau stream at Sorigny + (March 31, 2009)
- Case study:Bosgården nature-like fishway at River Rolfså + (June 4, 2009)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (August 1, 2009)