Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Aaijen- Removal of bank fixation + (January 1, 2006)
- Case study:Restoration of Siuruanjoki River + (January 1, 2006)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (January 1, 2006)
- Case study:Creation and restoration of a riparian zone + (February 1, 2006)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (March 1, 2006)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (March 1, 2006)
- Case study:Bleinheim Palace Project + (March 1, 2006)
- Case study:Lippenbroek Regulated Tidal Exchange Scheme + (March 1, 2006)
- Case study:Lower River Roding Regeneration Project + (March 31, 2006)
- Case study:Ecological Restoration of Natural Lake Pochina + (June 1, 2006)
- Case study:Chowder Ness Managed Realignment Scheme + (July 3, 2006)
- Case study:New Forest LIFE project + (August 1, 2006)
- Case study:The Ciobarciu Wetland Project + (October 1, 2006)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (November 1, 2006)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (November 25, 2006)
- Case study:Restoration of riparian zone in Aragon River + (December 1, 2006)
- Case study:Removal of five Lakes on the Val des Choues stream + (January 1, 2007)
- Case study:Restoration of Juottimenoja Brook + (January 1, 2007)
- Case study:Restoration of Ingarskilanjoki River + (January 1, 2007)
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (January 1, 2007)
- Case study:Vallacuera Ravine. Removal of a dyke + (April 1, 2007)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (July 1, 2007)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (August 1, 2007)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (October 1, 2007)
- Case study:Removal of the Fatou dam on the Beaume river + (October 1, 2007)
- Case study:Glaisdale Beck diversion scheme + (October 10, 2007)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (November 1, 2007)
- Case study:Inchewan Burn Bed restoration + (November 1, 2007)
- Case study:Improving the structure of the Lahn-patak in Hungary + (November 1, 2007)
- Case study:Removal of a pond weir in a tributary of Petersbach + (November 1, 2007)
- Case study:Restoration of the river area of the section of Betzuca stream + (December 1, 2007)
- Case study:Environmental improvement project of the stream of Ruby + (December 1, 2007)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (December 31, 2007)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (January 1, 2008)
- Case study:Buenz + (January 1, 2008)
- Case study:River Roding at Ray Lodge Park + (January 1, 2008)
- Case study:Meades water garden regeneration project + (January 1, 2008)
- Case study:Room for the River + (January 1, 2008)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (January 1, 2008)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (March 1, 2008)
- Case study:Restoration of a section of Torrente de Can Sunyer passing through Martorelles + (March 1, 2008)
- Case study:Reppisch + (April 1, 2008)
- Case study:Restoration of Vesselina River + (April 1, 2008)
- Case study:Proposal for landscape and environmental improvement of the canal of Sils + (April 1, 2008)
- Case study:Ems floodplain + (June 1, 2008)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (June 1, 2008)
- Case study:Vester Nebel Restoration + (July 1, 2008)
- Case study:Case study:Biological protection shield to control streambank erosion in Ätran 2 + (August 3, 2008)
- Case study:Ladywell Fields (QUERCUS) + (September 1, 2008)
- Case study:Marsh restoration on the Merlue + (September 1, 2008)
- Case study:Restoring the River Doquette to its original bed + (October 1, 2008)