Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Gelsa at Bevtoft + (September 1, 1989)
- Case study:Opijnen- Side channel + (January 1, 1994)
- Case study:The Babina Restoration Project + (May 1, 1994)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (January 1, 1995)
- Case study:Long Eau (Great Eau) + (July 1, 1995)
- Case study:River Skerne- Life project + (September 1, 1995)
- Case study:River Cole- Life Project + (September 1, 1995)
- Case study:The Cernovca Restoration Project + (January 1, 1996)
- Case study:Fluvial restoration in River Carrión + (November 1, 1996)
- Case study:Kleblach-Side channel + (January 1, 1997)
- Case study:Lippeaue Klostermersch + (January 1, 1997)
- Case study:Beneden-Leeuwen-Side channel + (January 1, 1997)
- Case study:Rio Tepice urban restoration + (December 1, 1997)
- Case study:Meers - Floodplain lowering + (January 1, 1998)
- Case study:Regelsbrunner Aue + (January 1, 1998)
- Case study:Wummewiesen restoration project + (January 1, 1998)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (May 1, 1998)
- Case study:Land acquisition on the banks of the Ouche River + (June 30, 1998)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (July 1, 1998)
- Case study:River Ogwen and Nant Francon + (November 30, 1998)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (April 1, 1999)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (December 1, 1999)
- Case study:Restoration of a stream of the Jarama River, Valdetorres de Jarama + (January 1, 2000)
- Case study:Remeandering of the Drésine and of the Remoray stream + (February 29, 2000)
- Case study:Diversion of the River Nith + (September 1, 2000)
- Case study:Wensum River Restoration Strategy + (October 1, 2000)
- Case study:Refilling the meanders of the Colostre + (January 1, 2001)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (January 1, 2001)
- Case study:Rijkelse Bemden - River bed widening + (January 1, 2001)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (October 1, 2001)
- Case study:Thur + (January 1, 2002)
- Case study:Vreugderijkerwaard side channel + (January 1, 2002)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (June 1, 2002)
- Case study:Harbertonford Flood Alleviation Scheme + (September 1, 2002)
- Case study:River Quaggy- Chinbrook meadows + (October 1, 2002)
- Case study:Langford Lakes project + (October 1, 2002)
- Case study:Blanice River + (December 31, 2002)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (January 1, 2003)
- Case study:Restoration of Myllypuro brook + (January 1, 2003)
- Case study:Restoration of Naarkoski Torrent + (January 1, 2003)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (December 1, 2003)
- Case study:Flood management and ecological restoration in the Dijle valley + (December 31, 2003)
- Case study:The Holbina-Dunavat Restoration Project + (January 1, 2004)
- Case study:Boosting slivso + (March 1, 2004)
- Case study:Sutcliffe Park + (June 1, 2004)
- Case study:Voorste Nete at Dessel + (June 1, 2004)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (June 1, 2004)
- Case study:Rother meander reconnection + (September 1, 2004)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (September 1, 2004)