Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (December 1, 2008)
- Case study:Prologis Midpoint Park river restoration scheme + (December 1, 2008)
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos + (January 1, 2009)
- Case study:River Avon at East Chisenbury + (January 1, 2009)
- Case study:Buiten Ooij + (January 1, 2009)
- Case study:Restoration of Vakkolankoski Torrent + (January 1, 2009)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (January 1, 2009)
- Case study:Ladywell Fields toeboarding + (January 1, 2009)
- Case study:Morden Hall Park Water Vole Habitat Enhancement + (January 1, 2009)
- Case study:Poulter Park + (January 1, 2009)
- Case study:Dagenham Brook de-silting + (January 1, 2009)
- Case study:Ferry Lane North drainage realignment + (January 1, 2009)
- Case study:Hackbridge Restoration + (January 1, 2009)
- Case study:New South Quarter - Croydon + (January 1, 2009)
- Case study:River Pinn Enhancement near Ickenham + (January 1, 2009)
- Case study:Morden Hall + (January 1, 2009)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (February 1, 2009)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (March 1, 2009)
- Case study:Remeandering of the Mardereau stream at Sorigny + (March 31, 2009)
- Case study:Bosgården nature-like fishway at River Rolfså + (June 4, 2009)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (August 1, 2009)
- Case study:HPP Blanca + (August 1, 2009)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (August 1, 2009)
- Case study:Restoration of the previous riverbed of the Dadon + (September 1, 2009)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (September 1, 2009)
- Case study:´Restorations of River Nolån-Fishway in Forsa hydro power plant + (September 1, 2009)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (September 1, 2009)
- Case study:Fluvial improvement in Riera de Caldés + (November 1, 2009)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (November 1, 2009)
- Case study:Ecological Restoration of Vlascuta Lake + (November 1, 2009)
- Case study:Removal of the Stalapos weir over the river Alagnon + (November 1, 2009)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (December 1, 2009)
- Case study:RESTORATION OF THE TRESENEC STREAM + (December 1, 2009)
- Case study:RSPB Fowlmere Nature Reserve + (December 1, 2009)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (December 1, 2009)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (December 1, 2009)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (December 31, 2009)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (January 1, 2010)
- Case study:Weir demolition in river Nansa, Cantabria + (January 1, 2010)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (January 1, 2010)
- Case study:Restorations of Ritobäcken brook + (January 1, 2010)
- Case study:Regeneration of the banks of the river Mape + (January 1, 2010)
- Case study:Llobregat river restoration + (January 1, 2010)
- Case study:Lea Bridge Waterway Wall Improvements + (January 1, 2010)
- Case study:Plough Lane weir removal + (January 1, 2010)
- Case study:River Shuttle Enhancement Works - Love Lane + (January 1, 2010)
- Case study:Merton Abbey Mills Eel Pass + (January 1, 2010)
- Case study:Big Yellow + (January 1, 2010)
- Case study:Cray River Enhancement + (January 1, 2010)
- Case study:River Kennet Restoration at Durnsford + (March 1, 2010)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (March 1, 2010)
- Case study:Barnes Common + (March 31, 2010)
- Case study:Restoration of a stretch of the river of Santa Coloma + (April 1, 2010)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (May 1, 2010)