Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Restoration of the previous riverbed of the Dadon + (September 1, 2009)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (September 1, 2009)
- Case study:´Restorations of River Nolån-Fishway in Forsa hydro power plant + (September 1, 2009)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (September 1, 2009)
- Case study:Fluvial improvement in Riera de Caldés + (November 1, 2009)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (November 1, 2009)
- Case study:Ecological Restoration of Vlascuta Lake + (November 1, 2009)
- Case study:Removal of the Stalapos weir over the river Alagnon + (November 1, 2009)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (December 1, 2009)
- Case study:RESTORATION OF THE TRESENEC STREAM + (December 1, 2009)
- Case study:RSPB Fowlmere Nature Reserve + (December 1, 2009)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (December 1, 2009)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (December 1, 2009)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (December 31, 2009)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (January 1, 2010)
- Case study:Weir demolition in river Nansa, Cantabria + (January 1, 2010)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (January 1, 2010)
- Case study:Restorations of Ritobäcken brook + (January 1, 2010)
- Case study:Regeneration of the banks of the river Mape + (January 1, 2010)
- Case study:Llobregat river restoration + (January 1, 2010)
- Case study:Lea Bridge Waterway Wall Improvements + (January 1, 2010)
- Case study:Plough Lane weir removal + (January 1, 2010)
- Case study:River Shuttle Enhancement Works - Love Lane + (January 1, 2010)
- Case study:Merton Abbey Mills Eel Pass + (January 1, 2010)
- Case study:Big Yellow + (January 1, 2010)
- Case study:Cray River Enhancement + (January 1, 2010)
- Case study:River Kennet Restoration at Durnsford + (March 1, 2010)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (March 1, 2010)
- Case study:Barnes Common + (March 31, 2010)
- Case study:Restoration of a stretch of the river of Santa Coloma + (April 1, 2010)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (May 1, 2010)
- Case study:Bures Mill fish by-pass + (May 1, 2010)
- Case study:Dove Weir removal + (August 1, 2010)
- Case study:River Restoration at Hunworth (River Glaven) + (August 18, 2010)
- Case study:River restoration project of the stream of Vallvidrera + (September 1, 2010)
- Case study:Moreton Channel Gravel Reprofiling + (September 5, 2010)
- Case study:River Calder improvement project + (October 1, 2010)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (October 1, 2010)
- Case study:Rio Mareta restoration at Stanghe (Sterzing-Vipiteno) + (October 31, 2010)
- Case study:Valtellina 2005 – New green system + (November 1, 2010)
- Case study:The Umbusi River + (November 15, 2010)
- Case study:Černý potok stream restoration scheme + (November 30, 2010)
- Case study:Removal of the Coupeau impoundment on Vicoin River and riverbed restoration + (December 1, 2010)
- Case study:South Esk restoration + (January 1, 2011)
- Case study:Restoration of Longinoja brook + (January 1, 2011)
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (January 1, 2011)
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (January 1, 2011)
- Case study:Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. + (January 1, 2011)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (January 1, 2011)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (January 1, 2011)
- Case study:Dagenham Washlands Phase 2 + (January 1, 2011)
- Case study:Hogsmill Sewage Treatment Works phase 1 + (January 1, 2011)