Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Regeneration of the banks of the river Mape + (Department of Environment)
- Case study:Water and Life for Drava and Vuka + (Duna-Dráva National Park Directorate)
- Case study:Valtellina 2005 – New green system + (ERSAF – Morbegno (SO))
- Case study:Stainby Road, Colsterworth + (East Mercia Rivers Trust)
- Case study:Ennerdale Mill Weir Removal + (Ebsford Environmental)
- Flood detention basin (HRB) Ickern-Mengede + (Emschergenossenschaft)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (Enginyeria, Estudios i Gestió Ambiental S.L.)
- Case study:River Avon Our Water Environment + (EnviroCentre)
- Case study:River Wensum Rehabilitation Project - Bintree + (Environment Agency)
- Case study:River Avon at East Chisenbury + (Environment Agency)
- Case study:River Glaven conservation group + (Environment Agency)
- Case study:River Roding at Ray Lodge Park + (Environment Agency)
- Case study:Wensum River Restoration Strategy + (Environment Agency)
- Case study:Ouzel habitat improvement + (Environment Agency)
- Case study:Enhancement of the River Crouch following a pollution incident + (Environment Agency)
- Case study:Adams Mill enhancements + (Environment Agency)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Environment Agency)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Environment Agency)
- Case study:Stony Stratford Sluice bank repairs + (Environment Agency)
- Case study:Woughton on the Green bank stabilization + (Environment Agency)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Environment Agency)
- Case study:River restoration on the River Brett at Shelley + (Environment Agency)
- Case study:River Adur - Shipley weir removal + (Environment Agency)
- Case study:Southington River Restoration Project + (Environment Agency)
- Case study:Test and Itchen River Restoration Strategy 2 + (Environment Agency)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Environment Agency)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Environment Agency and C A Blackwell)
- Case study:Little Waltham Meadows Back Channel creation + (Essex Wildlife Trust)
- Case study:Bocking Blackwater River Restoration + (Essex Wildlife Trust)
- Case study:Millfield Plantation 2 + (Essex Wildlife Trust)
- Case study:Ironbridge Farm + (Essex Wildlife Trust)
- Case study:Removal of the Fatou dam on the Beaume river + (Etablissement public de Loire)
- Case study:HLS New Forest + (Forestry Commission)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Fundación Naturaleza y Hombre)
- Case study:Restoring the River Doquette to its original bed + (Fédération de la Manche pour la pêche et la protection du milieu aquatique)
- Case study:Off-Channels Restauration + (Fédération des Hautes Alpes pour la pêche et la protection du milieu aquatique)
- Case study:Dumbreck Marsh & Garrel Burn Restoration + (George Leslie/WSP/CBEC)
- Case study:Vallacuera Ravine. Removal of a dyke + (Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A.)
- Case study:Restoration of riparian zone in Aragon River + (Gestión Ambiental, Viveros y Repoblaciones de Navarra S.A.)
- Case study:RESTORATION OF THE TRESENEC STREAM + (Gradbinko d.o.o.)
- Case study:Day Brook Restoration - Gedling + (Groundwork Greater Nottingham)
- Case study:Mill Road Weir, Pontypool + (Groundwork Wales)
- Case study:Marine Colliery river blockage + (Groundwork Wales)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (ISTEM (sistema de placas fotovoltaica))
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (Jogosa Obras y Servicios, S.L.)
- Case study:Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. + (Jogosa Obras y Servicios, S.L.)
- Case study:Guadiamar Green Corridor Project + (Junta de Andalucía)
- Case study:Matasaru Area - A new life on the river Arges + (Lafarge)
- Case study:Dove Weir removal + (Leek and District Fly Fishing Association)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Limnos ltd.)
- Case study:Upper Cringle Floodplain Restoration Project + (Lincolnshire Rivers Trust)
- Case study:Mayesbrook Climate Change Park restoration project + (London Borough of Barking and Dagenham)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (MEDIODÉS)
- Case study:Rodley weir by pass channel + (MMB)