Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Stony Stratford Sluices Bypass Channel + (AMCO)
- Case study:Restoration project in Verde River + (ARIN (Arquitectos/Ingenieros Consultores S.A.))
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (ASAJA)
- Case study:Environmental design Mandalsvassdraget + (Agder Energi)
- Case study:Allt Lorgy River Restoration + (Allan Munro Construction /Spey District Fishery Board)
- Case study:ReNaturalize + (Aplysia)
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia) + (Aquanea)
- Case study:Welland for People and Wildlife Project + (Aquascience)
- Case study:Segura's River Bioremediation + (BIOPULCHER S.L.)
- Case study:Kirkstall Valley Weir Fish Passes Project + (Bailey Construction (NW) Ltd)
- Case study:Short Heath Brook Project + (Birmingham City Cocncil)
- Case study:Habitat measures Hollundbekken + (Bømlo municipality)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (C.H. Cantábrico)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (C.H. Cantábrico)
- Case study:Weir demolition in river Nansa, Cantabria + (C.H. Cantábrico)
- Case study:Restoration of the marsh "Gallega" + (C.H.Guadalquivir)
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros + (C.H.Guadalquivir)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (C.H.Júcar)
- Case study:Restoration project in Turia River + (C.H.Júcar)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (C.H.Tajo)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (C.H.Tajo)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (C.H.Tajo)
- Case study:Old Station Beat restoration, River Test at Bossington + (Cain Bio-Engineering Ltd.)
- Case study:PROGETTO WETLAND - Volturno + (Caserta County)
- Case study:Timber float restorations at River Iijoki + (Centre for Economic Development, Transport and the Environment)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Chilterns Chalk Streams Project)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Confederación Hidrográfica del Duero)
- Case study:Fluvial restoration in River Carrión + (Confederación Hidrográfica del Duero)
- Case study:Refilling the meanders of the Colostre + (Conseil Supérior de la Pêche-Departmental Brigade)
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake + (Consejeria de medio ambiente-Xunta de Galicia)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Consejería de Desarrollo Sostenible y Ordenación del Territorio)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Danube Delta National Institute)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Danube Delta National Institute)
- Case study:Knock Burn low flow channel + (Department of Agriculture & Rural Development Rivers Agency)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Department of Agriculture & Rural Development Rivers Agency)
- Case study:Enler River enhancement project + (Department of Agriculture & Rural Development Rivers Agency)
- Case study:Removal of the migration barriers for aquatic organisms on the river Wisłoka and its tributaries – Ropa and Jasiołka + (Department of Ecological Researches)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (Department of Ecological Researches)
- Case study:Regeneration of the banks of the river Mape + (Department of Environment)
- Case study:Water and Life for Drava and Vuka + (Duna-Dráva National Park Directorate)
- Case study:Valtellina 2005 – New green system + (ERSAF – Morbegno (SO))
- Case study:Stainby Road, Colsterworth + (East Mercia Rivers Trust)
- Case study:Ennerdale Mill Weir Removal + (Ebsford Environmental)
- Flood detention basin (HRB) Ickern-Mengede + (Emschergenossenschaft)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (Enginyeria, Estudios i Gestió Ambiental S.L.)