Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (Drew)
- Case study:River Wensum Rehabilitation Project - Bintree + (Dryden)
- Case study:Wensum River Restoration Strategy + (Dryden)
- Case study:Mayesbrook Climate Change Park restoration project + (Farris)
- Case study:Cudworth dyke restoration project + (Gledhill)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Greer)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Holmes)
- Case study:Restoration of Szárazerdei river branch + (Janák)
- Case study:Removal of the migration barriers for aquatic organisms on the river Wisłoka and its tributaries – Ropa and Jasiołka + (Karol Ciężak)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (Karol Ciężak, Jacek Engel)
- Case study:Spring Meadow Meander Restoration + (King)
- Case study:Twineham Weir Removal & In-channel Enhancements + (King)
- Case study:Broadwater Brook + (King)
- Case study:Isar-Plan + (Kirner)
- Case study:Southington River Restoration Project + (Leman)
- Case study:Test and Itchen River Restoration Strategy 2 + (Leman)
- Case study:River Avon Our Water Environment + (MacDougall)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Mag)
- Case study:Watercress Farm Rewetting Project + (May)
- Case study:Lodge Burn Flood Alleviation Scheme + (McElduff)
- Case study:Enhancement of the River Crouch following a pollution incident + (Miles)
- Case study:Manthorpe Floodplain Reconnection + (Mungovan)
- Case study:Water and Life for Drava and Vuka + (Parrag)
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (Pearl)
- Case study:River restoration on the River Brett at Shelley + (Pearl)
- Case study:Matasaru Area - A new life on the river Arges + (Petcu)
- Case study:ReNaturalize + (Pinto)
- Case study:PROGETTO WETLAND - Volturno + (Pirone)
- Case study:Saving Chiswick Eyot + (Richardson)
- Case study:Gilev's Grove reconstruction + (Russu)
- Case study:Short Heath Brook Project + (Sangha)
- Case study:The Ciobarciu Wetland Project + (Savin)
- Case study:Swindale Beck Restoration + (Schofield)
- Case study:Prologis Midpoint Park river restoration scheme + (Storer)
- Case study:Removal of a pond weir in a tributary of Petersbach + (Sycoparc, Office national de l’eau et des milieux aquatiques (Onema) - service départemental, direction régionale de l’environnement (DIREN), agence de l’eau.)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Sánchez Martínez)
- Case study:Upper Cringle Floodplain Restoration Project + (Talton)
- Case study:Stainby Road, Colsterworth + (Talton)
- Case study:Restoration of Grobruelva + (Tandberg)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Twohig)
- Case study:Stroud Rural Sustainable Drainage Project + (Uttley)
- Case study:Timber float restorations at River Iijoki + (Yrjänä)