Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Dovers Corner + (Economic benefits)
- Case study:Goresbrook and Ship and Shovel Sewer + (Economic benefits)
- Case study:Manor House Gardens + (Economic benefits)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Economic benefits)
- Case study:Salmons Brook River Restoration at Laymer Road + (Economic benefits)
- Case study:Water Quality Restoration River Dun- Canal Bypass Weirs + (Economic benefits)
- Case study:Thames 21 Salmons Brook Diffuse Pollution Urban Project + (Economic benefits)
- Case study:The Pow Beck Improvement Project + (Economic benefits)
- Case study:Diffusing the Issue in rural Ribble + (Economic benefits)
- Case study:Haltwhistle burn; a total catchment approach + (Community engagement)
- Case study:Pearls in Peril LIFE+ GB Project + (Encyst juvenile salmon with local pearl mussel larvae)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (Engagement activities will include face-to-face contact.)
- Case study:Beekherstel Reusel Baarschot-Diessen + (Er worden gebiedsbijeenkomsten gehouden voor belanghebbende)
- Case study:The River Deerness Project + (Establishment of partnership working and joint delivery to be extended under the auspices of the Wear Catchment Management Plan.)
- Case study:ReNaturalize + (Exit Plan)
- Case study:Darley Abbey Fish Pass Project + (Film made)
- Case study:Bringing Back the Bulbourne + (Survey work)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Frequent monitoring detecting n3ew alien species to be dealt with immediately; Local site-specific chemical monitoring is ongoing and that it is effective; Set up a monitoring plan is for each site; Government)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Improvement of the socio-economic and other culture heritage network)
- Case study:Carnon River: Abandoned Metal Mines + (inverte-brate analysis)
- Case study:The Red River: Abandoned Metal Mines + (Improving water quality)
- Case study:Barney Beck: Abandoned Metal Mines + (Sampling to investigate metal pollution)
- Case study:Gunnerside Gill: Abandoned metal mines + (Sampling to investigate metal pollution)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Survey work)
- Case study:Gategill Beck: Abandoned Metal Mines + (Improving water quality)
- Case study:Sharnberry Mine: Abandoned Metal Mines + (Ecological survey)
- Case study:West Allen: Abandoned Metal Mines + (Improving water quality)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Popularization of the project; information provision – project website)
- Case study:Welland for People and Wildlife Project + (Information board erected)
- Case study:River Monnow (Going Native) + (Information board erected)
- Case study:Aston Clinton River Restoration + (Information board erected)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Information board erected)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Information board erected)
- Case study:Logie Burn Restoration Project + (Information board erected)
- Case study:Assessing the habitats outcomes of Floodplain Forest restoration: the case study of the floodplain forest at the Ouse Valley Park + (Information board erected)
- Property:Wider engagement measure + (Information provision)
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins + (Information provision)
- Case study:Ecological Restoration of Vlascuta Lake + (Information provision)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Information provision)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (popularization of the project)
- Case study:Conservation of alluvial + (Information provision)
- Case study:Improving the structure of the Lahn-patak in Hungary + (Information provision)
- Case study:Ecological Restoration of Natural Lake Pochina + (Information provision)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Information provision)
- Case study:Rehabilitation of Benta stream + (Information provision)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (Participation in monitoring)
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Information provision)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Information provision)
- Case study:Meades water garden regeneration project + (Public consultation)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Information provision)
- Case study:Restoration of Ingarskilanjoki River + (Participation in design)
- Case study:Restoration of Longinoja brook + (Information provision)
- Case study:Room for the River + (Information provision)
- Case study:River Dee + (Information provision)
- Case study:Restoration of Siuruanjoki River + (Information provision)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Consultation)
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (Information provision)