Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Improving the structure of the Lahn-patak in Hungary + (Information provision)
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume + (Participation in monitoring)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Information provision)
- Case study:River Roding at Ray Lodge Park + (Participation in maintenance)
- Case study:Room for the River + (Information provision)
- Case study:River Dee + (Information provision)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Consultation)
- Case study:River Quaggy- Chinbrook meadows + (Information provision)
- Case study:River Skerne- Life project + (Participation in works)
- Case study:The Ciobarciu Wetland Project + (Consultation)
- Case study:Valtellina 2005 – New green system + (Consultation)
- Case study:River Avon Stream project + (Consultation)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Information provision)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (Information provision)
- Case study:Vester Nebel Restoration + (Information provision)
- Case study:Water and Life for Drava and Vuka + (Information provision)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Information provision)
- Case study:INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract + (Continue control of invasive species; communication activities; monitoring activities)
- Case study:Doñana 2005 + (Quantity & dynamics of flow)
- Case study:VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) + (Creation of new ecotourism products)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Crops from the private property for nesting and alimentation)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Definition of environmental objectives and indicators and monitoring program.)
- Case study:Allt Lorgy River Restoration + (Demonstration site for natural flood management techniques)
- Case study:INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain + (Development of environmentally sustainable rice farming)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Drafting of a monitoring plan; Installation of weather stations and water level stations; Sampling campaigns for monitoring of chemical)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Eco-innovation (ECOMO) Odiel marshes (incubator and accelerator of eco-entrepreneurs and green employment); Promotion of green infrastructures)
- Case study:Sharnberry Mine: Abandoned Metal Mines + (Ecological survey)
- Case study:Minsterley Brook Abandoned Metal Mines + (Ecological survey)
- Case study:Wye Herefordshire Improvement Project + (Economic aspects)
- Case study:Buzzards Mouth Creek + (Economic benefits)
- Case study:Dovers Corner + (Economic benefits)
- Case study:Goresbrook and Ship and Shovel Sewer + (Economic benefits)
- Case study:Manor House Gardens + (Economic benefits)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Economic benefits)
- Case study:Salmons Brook River Restoration at Laymer Road + (Economic benefits)
- Case study:Water Quality Restoration River Dun- Canal Bypass Weirs + (Economic benefits)
- Case study:Thames 21 Salmons Brook Diffuse Pollution Urban Project + (Economic benefits)
- Case study:The Pow Beck Improvement Project + (Economic benefits)
- Case study:Diffusing the Issue in rural Ribble + (Economic benefits)
- Case study:Haltwhistle burn; a total catchment approach + (Community engagement)
- Case study:Pearls in Peril LIFE+ GB Project + (Encyst juvenile salmon with local pearl mussel larvae)
- Case study:Source to Sea Programme – 1. Leighton Moss Resource Protection + (Engagement activities will include face-to-face contact.)
- Case study:Beekherstel Reusel Baarschot-Diessen + (Er worden gebiedsbijeenkomsten gehouden voor belanghebbende)
- Case study:The River Deerness Project + (Establishment of partnership working and joint delivery to be extended under the auspices of the Wear Catchment Management Plan.)
- Case study:ReNaturalize + (Exit Plan)
- Case study:Darley Abbey Fish Pass Project + (Film made)
- Case study:Rookhope Burn: Abandoned Metal Mines + (Survey work)
- Case study:Bringing Back the Bulbourne + (Survey work)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Frequent monitoring detecting n3ew alien species to be dealt with immediately; Local site-specific chemical monitoring is ongoing and that it is effective; Set up a monitoring plan is for each site; Government)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Improvement of the socio-economic and other culture heritage network)
- Case study:Carnon River: Abandoned Metal Mines + (inverte-brate analysis)
- Case study:The Red River: Abandoned Metal Mines + (Improving water quality)