Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Burton Weir (Upper) Fish Pass Project + (River Trent from Anker/Mease Conf to River Dove)
- Case study:River Tutt Restoration Project + (River Tutt)
- Case study:Trees on the River Uck + (River Uck at Uckfield)
- Case study:Eldbäcken + (River Västerdalälven)
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (River Wensum)
- Case study:Seven Hatches + (River Wylye)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (Rivers Kent, Sprint, Mint)
- Case study:Eden Crayfish Restoration Project + (Rivers Leith, Lyvennet, Lowther, Hoff and Helm Becks, Croglin Water and Hayber Beck)
- Case study:River Roding at Ray Lodge Park + (Roding (Cripsey Brook to Loxford Water))
- Case study:Fresh Wharf + (Roding (Cripsey Brook to Loxford Water))
- Case study:Chigwell Brook + (Roding (Cripsey Brook to Loxford Water))
- Case study:Valentines Park + (Roding (Cripsey Brook to Loxford Water))
- Case study:Land opposite Wanstead Park + (Roding (Cripsey Brook to Loxford Water))
- Case study:Weir upstream of Redbridge roundabout + (Roding (Cripsey Brook to Loxford Water))
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Rolfsån River)
- Case study:Rewilding the Rom + (Rom (Bourne Brook to Ravensbourne) Water Body)
- Case study:Roneo Corner + (Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne))
- Case study:King Georges Playing Field + (Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne))
- Case study:Colliers Row + (Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne))
- Case study:Raphael Park + (Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne))
- Case study:Chase Nature Reserve + (Rom / Beam (Including Bourne Brook, from Watton's Green to confluence with Ravensbourne))
- Case study:Dagenham Washlands Phase 2 + (Rom / Beam (from Ravensbourne confluence to Thames))
- Case study:Harrow Lodge Park + (Rom / Beam (from Ravensbourne confluence to Thames))
- Case study:Haynes Park + (Rom / Beam (from Ravensbourne confluence to Thames))
- Case study:Rookhope Burn: Abandoned Metal Mines + (Rookhope Burn from Source to Wear)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Røssåga mellom samløp Leirelva og Sjøforsen)
- Case study:Restoration project of riparian buffer of the Sesia river + (SESIA)
- Case study:The South Cornwall River Improvement Project - St. Austell + (ST. AUSTELL RIVER)
- Case study:The South Cornwall River Improvement Project – Crinnis + (ST. AUSTELL RIVER)
- Case study:River Stour at Glen's weir (Throop fisheries) + (STOUR (Lower))
- Case study:Laymer Road Silt Trap and Recreational Ground + (Salmons Brook)
- Case study:Bury Lodge Wetlands + (Salmons Brook)
- Case study:Salmons Brook River Restoration at Laymer Road + (Salmons Brook)
- Case study:Salmons Brook at Grange Park + (Salmons Brook)
- Case study:Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site + (Salmons Brook)
- Case study:Glenbrook Wetlands + (Salmons Brook)
- Case study:Grovelands Park Wetlands + (Salmons Brook)
- Case study:Alma Road Rain Gardens + (Salmons Brook)
- Case study:Enfield Town Park Wetlands + (Salmons Brook)
- Case study:Rewilding Enfield's Urban Rivers + (Salmons Brook)
- Case study:Houndsden Road Rain Gardens + (Salmons Brook)
- Case study:Saltburn Gill ironstones mines + (Saltburn Gill Catch trib of North Sea)
- Case study:Deculverting Holtan stream + (Sandefjordsfjorden bekkefelt sør/vest)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Segura River)
- Case study:LIFE Segura Riverlink (Through rivers) + (Segura River)
- Case study:Mayesbrook Climate Change Park restoration project + (Seven Kings Water)
- Case study:Goodmayes Park, Mayes Brook + (Seven Kings Water)
- Case study:County Gardens, Mayes Brook + (Seven Kings Water)
- Case study:Seven Kings Water + (Seven Kings Water)
- Case study:Blake Avenue, Mayes Brook + (Seven Kings Water)
- Case study:Fairlop Plain and Fairlop Water + (Seven Kings Water)
- Case study:Loxford Water + (Seven Kings Water)
- Case study:Salmon Conservation + (Severn Middle)
- Case study:RSPB Fowlmere Nature Reserve + (Shep)
- Case study:Guphill Brook Riverine Enhancement + (Sherbourne - source to conf R Sowe)
- Case study:Sherborne Windrush Restoration Project + (Sherbourne Brook)
- Case study:Hollyoak Wood and Willersley Park + (Shuttle)
- Case study:River Shuttle Enhancement Works - Love Lane + (Shuttle)
- Case study:Parish Wood Park + (Shuttle)
- Case study:River Shuttle Enhancement Works - Malborough Park + (Shuttle)
- Case study:Edgeware Brook, Honeypot Lane + (Silk Stream and Edgware Brook)