Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Rehabilitation of the River Brett at Shelley, Suffolk + (River Brett)
- Case study:River restoration on the River Brett at Shelley + (River Brett)
- Case study:River Calder improvement project + (River Calder)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (River Calder)
- Case study:Enhancement of the River Crouch following a pollution incident + (River Crouch)
- Case study:River Dearne at Mexborough + (River Dearne Darfield STW to River Don)
- Case study:Borrowash fish pass + (River Derwent from Bottle Brook to R Trent)
- Case study:Darley Abbey Fish Pass Project + (River Derwent from Bottle Brook to R Trent)
- Case study:Hadfield Weir Fish Pass + (River Don)
- Case study:River Don Restoration project + (River Don from source to tidal limit)
- Case study:Letting the Dove Flow 2 + (River Dove source to River Manifold)
- Case study:Ecclesbourne Farm project + (River Ecclesborne catchment (trib of R Derwent))
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (River Enns)
- Case study:Welton Farm Landfill/Riverbank Works + (River Ericht)
- Case study:River Eye + (River Eye)
- Case study:Source to Sea Programme – 10. River Gilpin, Foulshaw and Winster Restoration + (River Gilpin, River Winster, Chapel Pool, Meathop Marsh Drain)
- Case study:River Idle Hallcroft (Tiln) Weir Fish Pass + (River Idle from Maun/Poulter Conf to Tiln)
- Case study:River Idle Restoration Project + (River Idle from Tiln to River Ryton)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (River Johnsbach)
- Case study:Source to Sea Programme – 8. River Keer Restoration + (River Keer)
- Case study:Bowston Weir Removal + (River Kent)
- Case study:London Olympics Parklands + (River Lee Navigation, tidal section)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (River Leith)
- Case study:River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria + (River Lyvennet)
- Case study:River Mease Waterside Care + (River Mease from Hooborough Brook to Trent)
- Case study:River Meden response to diffuse pollution + (River Meden from Sookholme Brook to River Maun)
- Case study:River Irwell Restoration Project + (River Medlock (Lumb Brook to Irwell))
- Case study:Philips Park + (River Medlock (Lumb Brook to Irwell))
- Case study:Clayton Vale + (River Medlock (Lumb Brook to Irwell))
- Case study:River Nar Castle Acre Common WEG project + (River Nar)
- Case study:Diversion of the River Nith + (River Nith (u/s New Cumnock))
- Case study:River Nith Diversion at Greenburn Surface Mine + (River Nith (u/s New Cumnock))
- Case study:Restorations of River Nolån-Hulta dam removal + (River Nolån)
- Case study:´Restorations of River Nolån-Bypass channel in Hulta Hydro power plant + (River Nolån)
- Case study:´Restorations of River Nolån-Fishway in Forsa hydro power plant + (River Nolån)
- Case study:Creation of spawning ground for Baltic salmon, anadromous brown trout and river lamprey at Veneküla rapid, river Pirita + (River Pirita)
- Case study:Source to Sea Programme – 11. River Rawthey + (River Rawthey)
- Case study:Limestone Ribble Restoration Project + (River Ribble)
- Case study:Goshen Weir removal project, River Roch, Bury + (River Roch (Spodden to Irwell))
- Case study:Source to Sea Programme – 6. Roeburn Ford easement + (River Roeburn)
- Case study:Ålgårda nature-like bypass channel at River Rolfsån + (River Rolfsån)
- Case study:River Seaton: Abandoned Metal Mines + (River Seaton)
- Case study:River Soar Floating Pennywort Eradication + (River Soar from River Sence to River Wreake)
- Case study:River Soar fish refuge and wetland scrape + (River Soar from Rothley Brook to Long Whatton Brook)
- Case study:Sowe Valley Project + (River Sowe)
- Case study:Dam removal in River Stenån + (River Stenån)
- Case study:Apelnäs fishway at River Rolfså + (River Storån)
- Case study:River Stour Habitat Enhancements at Great and Little Bradley + (River Stour)
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (River Stour)
- Case study:Dam removal at Grönkullen, River Rolfsån + (River Sörån)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (River Tame from Conf of the two arms to R Blythe)
- Case study:River Tame at Salford Park ("SMURF") + (River Tame from Conf of the two arms to R Blythe)
- Case study:SMURF Tame + (River Tame from Conf of the two arms to R Blythe)