Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Habitat and water flow restoration on River Rábca + (AEP904)
- Case study:Improving the structure of the Lahn-patak in Hungary + (AQE127)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (AR02)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (AR05)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (AR48)
- Case study:Démantèlement de l’ouvrage du Pont Fourneau sur la Selle + (AR50)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (BG1DU000R001)
- Case study:Restoration of Rusenski Lom River near Ivanovo + (BG1RL120R013)
- Case study:Restoration of Vesselina River + (BG1YN130R029)
- Case study:Restoration and conservation of the protected site "Lozenski pat" - wetland + (BG3MA100R001)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (BG3MA300R040)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (BG3MA350R039)
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (BG3TU500R016)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (CR212)
- Case study:Effacement du seuil du Moulin d’Hatrize sur l’Orne + (CR381)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (CR434)
- Case study:Isar-Plan + (DE16_147237_173317)
- Case study:Lebendige Alster + (DEHH_al_05/15/16)
- Case study:Upper Emscher + (DE_NRW_2772_64190)
- Flood detention basin (HRB) Ickern-Mengede + (DE_NRW_2772_O)
- Case study:Deculverting Djupsund stream + (EU-ID:NO015-1467-R)
- Case study:Création d’un bras de contournement de plusieurs étangs sur le Fliez et restauration du marais de Contes + (FRAR05)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (FRAR13)
- Case study:Removal and opening of sluice gates on the Vence River + (FRB1R578)
- Case study:Retour dans son talweg d’origine de la Souffel à Reichstett et création de mares + (FRCR151)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (FRCR2)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (FRCR286)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (FRCR286)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (FRCR354)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (FRCR394)
- Case study:Removal of a pond weir in a tributary of Petersbach + (FRCR437)
- Case study:Restoration of the original riverbed of the Steinbaechlein + (FRCR62)
- Case study:Effacement partiel du seuil de Vas sur le Céans + (FRDR 283)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (FRDR0046)
- Case study:Reopening of the culverted Redon river + (FRDR11140)
- Case study:Restoration of the previous riverbed of the Dadon + (FRDR11706)
- Case study:Remeandering of the Drésine and of the Remoray stream + (FRDR12055)
- Case study:Reopening side channels along the Saône in Jassans-Riottier + (FRDR1807b)
- Case study:Reactivating river dynamics in the Vieux-Rhône River (non-navigable section) at Cornas, Roubion and Petite Île + (FRDR2007a)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (FRDR2024)
- Case study:Refilling the meanders of the Colostre + (FRDR251)
- Case study:Widening and sediment reloading of the Drac riverbed in Saint-Bonneten-Champsaur + (FRDR353b)
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River + (FRDR484)
- Case study:Marsh restoration on the Merlue + (FRDR493a)
- Case study:Removal of the Brosses weir on the Soanan River + (FRDR571)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (FRDR621)
- Case study:Land acquisition on the banks of the Ouche River + (FRDR646)
- Case study:Effacement du seuil de Carayon sur le Thoré + (FRFR1A)
- Case study:Restoring the natural dynamics of the upper Adour + (FRFR236 and FRFR237B)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (FRFR324A)
- Case study:Agreed definition of mobility area for the Adour + (FRFR327C)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (FRFR389)