Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (RWL1321)
- Case study:Habitat measures in Strynevassdraget + (RWL2241 and RWL2811)
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM + (SI141VT2 VTJ Cerkniško jezero (Cerknica lake))
- Case study:RESTORATION OF THE TRESENEC STREAM + (SI141VT2 VTJ Cerkniško jezero (Cerknica lake))
- Case study:River Ebbw Bank Stabilisation + (Mid)
- Case study:Spring Meadow Meander Restoration + (Low)
- Case study:Doñana 2005 + (Sinuous)
- Case study:Environmental restoration of the river Zújar + (Sinuous)
- Case study:River Wid restoration scheme + (Low)
- Case study:New Forest LIFE project + (Low)
- Case study:Braid Burn at Inch Park + (Low)
- Case study:Highland Water at Warwickslade Lawn + (Low)
- Case study:Diversion of the River Nith + (Mid)
- Case study:Harbertonford Flood Alleviation Scheme + (Low)
- Case study:Water of Dye Fish Pass Project + (Small)
- Case study:Mayesbrook Climate Change Park restoration project + (Low)
- Case study:River Wandle Restoration Project + (Low)
- Case study:Logie Burn Restoration Project + (Mid-altitude)
- Case study:Saltburn Gill ironstones mines + (Low)
- Case study:River Restoration at Hunworth (River Glaven) + (Low)
- Case study:River restoration and flood alleviation on the River Brain at Witham + (Low)
- Case study:Enhancement of the River Crouch following a pollution incident + (Low)
- Case study:Burn of Mosset, Forres + (Lowland)
- Case study:Whit Beck River Restoration Project + (Mid)
- Case study:River Adur - Shipley weir removal + (Low)
- Case study:Hoffer Brook + (Low)
- Case study:River Nith Diversion at Greenburn Surface Mine + (Mid-altitude)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (TR20)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (TR20)
- Case study:Restore riparian floodplain habitats maintained in reserve "Dolna topchia" and run off on his sleeve "Malka Tundzha" + (TR20)
- Case study:Restoration and conservation of the protected site "Lozenski pat" - wetland + (TR20)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" +
- Case study:Greatham Marsh Restoration + (TraC)
- Case study:Ems floodplain + (Type 15)
- Case study:Lippeaue Klostermersch + (Type 15)
- Flood detention basin (HRB) Ickern-Mengede + (Type 15: small sand-dominated lowland river)
- Case study:Irpin river restoration + (HMWB)
- Case study:Upper Emscher + (Type 18: small loess-loam dominated lowland river)
- Case study:Glenbrook Wetlands + (Type 18: small loess-loam dominated lowland river)
- Case study:Renaturierung Untere Havel + (Type 20: very large sand-dominated river)
- Case study:Isar-Plan + (Type 4 "gravel and stone embossed flow of the Alpine foothills")
- Case study:Rheinauen bei Rastatt + (Type 4 "gravel and stone embossed flow of the Alpine foothills")
- Case study:Lodge Burn Flood Alleviation Scheme + (Unknown)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (catchment area of MPVT Mestna Ljubljanica)
- Case study:Improvement of the River Varde at the Wadden Sea estuary + (coastal)
- Case study:Freiston Managed Realignment Scheme + (coastal)
- Case study:Noard-Fryslân Bûtendyks Managed Realignment Scheme + (coastal)
- Case study:Medmerry Managed Realignment Scheme + (coastal)
- Case study:Regional Actions to Improve Nature in River Odense and Odense Fjord (REGAIN) + (Intertidal)
- Case study:Source to Sea Programme + (Estuarine)
- Case study:Greenwich Peninsula + (intertidal)
- Case study:Barking Creek near A13 + (intertidal)
- Case study:Lippenbroek Regulated Tidal Exchange Scheme + (intertidal)
- Case study:Upper Cringle Floodplain Restoration Project + (limestone river)