Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Hogsmill Restoration Project +
- Case study:Reopening of a section of the River Bièvre in an urban environment +
- Case study:River Wid restoration scheme +
- Case study:Restoration of Myllypuro brook +
- Case study:Vindel River LIFE +
- Case study:Timber float restorations at River Iijoki +
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM +
- Case study:RESTORATION OF THE TRESENEC STREAM +
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica +
- Case study:Restoration in river Tajo and tributaries after kaolin spillage +
- Case study:Fluvial improvement in Riera de Caldés +
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain +
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos +
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. +
- Case study:Fluvial restoration in River Carrión +
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) +
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development +
- Case study:Restoration of the marsh "Gallega" +
- Case study:Meers - Floodplain lowering +
- Case study:River Wensum Rehabilitation Project - Bintree +
- Case study:Langonnet river +
- Case study:Renaturierung Untere Havel +
- Case study:Isar-Plan +
- Case study:Ems floodplain +
- Case study:Bleinheim Palace Project +
- Case study:River Cole- Life Project +
- Case study:River Dee +
- Case study:South Esk restoration +
- Case study:River Kennet Restoration at Durnsford +
- Case study:River Roding at Ray Lodge Park +
- Case study:Ladywell Fields (QUERCUS) +
- Case study:Rother meander reconnection +
- Case study:River Calder improvement project +
- Case study:RSPB Fowlmere Nature Reserve +
- Case study:Nar SSSI project +
- Case study:Dove Weir removal +
- Case study:Inchewan Burn Bed restoration +
- Case study:Kleblach-Side channel +
- Case study:Morava restoration project +
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort +
- Case study:River Rhee +
- Case study:Removal of the pont Paillard weir on a secondary arm of the Aume +
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu +
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream +
- Case study:Recreation of a sinuous low-flow channel in the Merloz +
- Case study:Restoration of the previous riverbed of the Dadon +
- Case study:Wensum River Restoration Strategy +
- Case study:Partial removal of weir on the Sanguèze at Mouzillon +
- Case study:Partial removal of weir on the Thouet at Le Tallud +
- Case study:Lower Aurino river: Molini di Tures riverbed widening +