Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM +
- Case study:RESTORATION OF THE TRESENEC STREAM +
- Case study:Restoration in river Tajo and tributaries after kaolin spillage +
- Case study:Fluvial improvement in Riera de Caldés +
- Case study:Weir demolition in river Nansa, Cantabria +
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos +
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. +
- Case study:Fluvial restoration in River Carrión +
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) +
- Case study:Restoration of the marsh "Gallega" +
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros +
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes +
- Case study:Recovery of the functionality of Brazo de la Torre +
- Case study:Recovery "CañoTravieso" +
- Case study:River restoration project of the stream of Vallvidrera +
- Case study:Guadiamar Green Corridor Project +
- Case study:River restoration project in Sella, Asturias +
- Case study:Regeneration of the banks of the river Mape +
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) +
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation +
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth +
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) +
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River +
- Case study:Llobregat river restoration +
- Case study:Increased biodiversity, river Llobregat, Sallent. +
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener +
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water +
- Case study:Fluvial river restoration of Tordera in Sant Celoni +
- Case study:Proposal for landscape and environmental improvement of the canal of Sils +
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. +
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) +
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan +
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor +
- Case study:Restoration of the river area of the section of Betzuca stream +
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès +
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac +
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic +
- Case study:Restoration project in Turia River +
- Case study:Restoration project in Verde River +
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area +
- Case study:Remeandering of the Drugeon and integrated management of its catchment +
- Case study:Knock Burn low flow channel +
- Case study:Kirkstall Valley Weir Fish Passes Project +
- Case study:River Frome Rehabilitation Plan +
- Case study:Welland for People and Wildlife Project +
- Case study:Darley Abbey Fish Pass Project +
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration +
- Case study:Wild Wylye Phase 1 +
- Case study:Minsterley Brook Abandoned Metal Mines +
- Case study:Restoration of the Bellegarde hydraulic annex and sediment recharge of the Ain River +