- Case study:Stroud Rural Sustainable Drainage Project + (Revenue project funding is provided by the Severn and Wye Regional Flood and Coastal Committee. Capital funding is supplied by Gloucestershire County Council, the Environment Agency and Stroud District Council.)
- Case study:Restoration of the lowland river system Grote Nete + (TOTAL BUDGET 3,120,940.00 € EU CONTRIBUTION 1,560,470.00 €)
- Case study:River Hogsmill Restoration Project + (The Environment Agency has contributed £13 … The Environment Agency has contributed £130,000</br></br>total cost estimates:</br>*Item Base Cost Budget Cost</br>*General Clearance £47,200 £56,640</br>*Tree Works £16,000 £19,200</br>*LB Re-profiling £18,900 £22,680</br>*RB Top of Bank Re-profiling £8,600 £10,320</br>*RB Low Level Footpaths Re-profiling £9,500 £11,400</br>*Wildlife Pond £18,100 £21,720</br>*New River Meander £24,500 £29,400</br>*New Backwater £12,000 £14,400</br>*Footpaths (tarmac or similar) – 450m £24,200 £29,040</br>*Footpaths (gravel or similar) - 1930m £44,800 £53,760</br>*Kingston Station Footpath - 200m £44,800 £53,760</br>*Bonesgate Stream Curved Bridge £24,200 £29,040</br>*Playground Bridge £23,600 £28,320</br>*Picnic Area £2,900 £3,480</br>*Lighting £7,000 £8,400</br>*General Planting £10,000 £12,000</br></br>Subtotal £403,560</br>Design and contract administration 15.0% £26,606</br>Overheads and profit 12.5% £22,172</br>Adjustment -7.5% -£13,303</br>Total (rounded up) £440,0007.5% -£13,303 Total (rounded up) £440,000)
- Case study:Noard-Fryslân Bûtendyks Managed Realignment Scheme + (The Noorderleech realignment cost some €600,000 in total – €2,000 of which were spent on permits, and €20,000 on plan production. It Fryske Gea alone spent at least 5,000 man-hours on implementing the scheme.)
- Case study:Apelnäs fishway at River Rolfså + (The building of the fishway cost 1 milj. Swedish crones (ca. 100 000 euros) and the habitat restoration 84 000 Swedish crones (ca. 8400 euros).)
- Case study:Wild Wylye Phase 1 + (The capital costs (and part of staff time) … The capital costs (and part of staff time) was funded by the Environment Agency and the landowners. The two main project partners (Wylye Fly Fishing Club and Wessex Chalk Streams Project - hosted by Wiltshire Wildlife Trust) provided staff time in-kind.</br></br>The total value of volunteer labour was conservatively estimated at £9250 (appr. 12500 EUR)ively estimated at £9250 (appr. 12500 EUR))
- Case study:Nar SSSI project + (The entire project, covering 1 km of chann … The entire project, covering 1 km of channel, was delivered by a team of 3 people in less than 3 days and for under 3 thousand pounds. Accordingly, although early days, it seems that the Nar SSSI project can be viewed as a successful low-cost ‘quick win’ project in a constrained site.‘quick win’ project in a constrained site.)
- Case study:River Valency at Boscastle + (The exact cost of the river restoration element of this project is unknown. The project was part of a £6.3M (€7.3M) flood risk management scheme.)
- Case study:Restoring of ecological connectivity and implementation of activities improving functioning of the free river migration corridor + (The project is implemented by National Wat … The project is implemented by National Water</br>Management Polish Waters Regional Water Management</br>Board in Krakow as part of the EU Operational Programme</br>Infrastructure and Environment 2014-2020.</br>Total cost: 9 248 830 €</br>Subsidy from the European Union: 7 840 380 €</br>Project implementation time: 2017-20200 € Project implementation time: 2017-2020)
- Case study:Irpin river restoration + (The project is still in the planning phase; funds not yet available)
- Case study:Improvement of the River Varde at the Wadden Sea estuary + (The project started in 01/01/1999 and was completed in 31/12/2002 EU contribution 713,036.46 €)
- Case study:Beltringharder Koog Regulated Tidal Exchange Scheme + (The scheme was financed by the federal state of Schleswig-Holstein and the German federal government (proportions and exact costs are unknown).)
- Case study:River Varde Valley and the meadows of Ho Bay (Ho Bugt) environment improvement project + (The total budget was approximately €23 mil … The total budget was approximately €23 million with €0.7 million provided by the EU LIFE programme and €20 million from agri-environmental subsidies. The LIFE funding (1996-2002) mainly contributed to the non-recurrent part of the project. The subsidies formed the main basis of financing for recurring environmentally-friendly management activities over 20 years (1999-2019). The remaining parts of the budget, especially pre-project costs and land redistribution costs, were covered by funding from the Danish Forestry and Nature Agency and the Danish Food Industry Agency.gency and the Danish Food Industry Agency.)
- Case study:Dam removal at Grönkullen, River Rolfsån + (The total costs were about 5 million Swedish crones including investigations, purchase of appropriate rights and their implementation, demolition of the dam and river restoration measures.)
- Case study:Robledo de Chavela dam removal + (There is a total budget of €1.5 million which includes the elimination of the dam and the renaturalization of the environment.)
- Case study:Anton Crescent Wetlands Regeneration + (This funding was matched by the London Borough of Sutton, through the provision of in-kind labour. London Borough of Sutton provided on-site project management and undertook all works required to implement the restoration work.)
- Case study:River of Life + (This project has been jointly funded and delivered by the Environment Agency and the Earth Trust.)
- Case study:Hurdalselva - River Hurdalselv + (This was.....)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (Total budget 2,363,206.00 € EU contribution 1,181,603.00 €)
- Case study:Removal of the migration barriers for aquatic organisms on the river Wisłoka and its tributaries – Ropa and Jasiołka + (Total cost of the project: 28.7 milion Polish zloty including the European Union support of 24.4 milion Polish zloty (85%) from the Cohesion Fund under Operational Program Infrastructure and Environment 2014-2020. Duration of the project: 2018-2021)
- Case study:Afon Merin Natural Process Restoration + (Total project cost including felling and installation of dams and scrapes was approximately £30,000)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Total budget 2,363,206.00 € EU contribution 1,181,603.00 €)
- Case study:Restoration and fish migration enhancement in the Wachau Valley + (Total budget 5,200,000.00 € EU contribution 2,600,000.00 €)
- Case study:LIFE+ Traisen + (VERBUND (15 million euros) and other finan … VERBUND (15 million euros) and other financing partners:</br>Office of the Lower Austrian Provincial Government</br>Federal Ministry of Agriculture, Regions and Tourism</br>EU-LIFE+ Nature and Biodiversity Fund</br>Lower Austria Landscape Fund</br>Lower Austrian Provincial Fishing Association</br>viadonauan Provincial Fishing Association viadonau)
- Case study:Knock Burn low flow channel + (Work carried out under the auspices of maintenance of the designated watercourse - adaptive mainteneace)
- Case study:Castle Irwell Urban Wetland + (Working with local community, the Universi … Working with local community, the University of Salford, Salford City Council, the Environment Agency identified an opportunity to work together to use land owned by University and Council to create a new flood basin to help reduce flood risk to people and property just downstream, but also create a new urban wildlife asset in the heart of city.urban wildlife asset in the heart of city.)
- Case study:River Dulais Restoration Project + (Works split into €20k for revetment work and €13k for fencing)
- Case study:Upper Cringle Floodplain Restoration Project + (Works were paid for by a Water Environment Improvement Fund Grant and land was contributed to the project by the landowner.)
- Case study:Lower Otter Restoration Project + (a managed realignment scheme delivered by the EA with a budget input of approx. £30 million £8.5 million of co-financing from the European Regional Development Fund (ERDF) through the Interreg V A France (Channel) England programme (2021 to 2023))
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (paid in pound 105,000)
- Case study:Greatham Marsh Restoration + (partnership funding)
- Case study:Wandsworth Riverside Quarter + (the whole scheme including the development cost between £100k-£500k)
- Case study:Nine Chalk Rivers Project + (there will also be match funding)
- Case study:River Adur - Shipley weir removal + (£37k was spent on replacing a welfare unit that was damaged in winter flooding. Cost of project would have been £40k otherwise)
- Case study:The South Cornwall River Improvement Project + (£410,444 from CRF, £27,000 from match funding)