Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Lullingstone Castle + (Mid Darent)
- Case study:Lullingstone Castle phase 2 + (Mid Darent)
- Case study:Darent Valley Path + (Mid Darent)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Middle Appenines - Badino)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Middle Appenines - Epitaffio)
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (Middle Appenines -Rio Martino)
- Case study:River Kennet Restoration at Durnsford + (Middle Kennet (Marlborough to Newbury))
- Case study:Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration + (Middle Kennet (Marlborough to Newbury))
- Case study:Eastridge Estate restoration project + (Middle Kennet (Marlborough to Newbury))
- Case study:River Rhee + (Mill River)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Minho)
- Case study:Minsterley Brook Abandoned Metal Mines + (Minsterley Bk - source to conf Rea Bk)
- Case study:MisbourneRiverAction + (Misbourne)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (Montone)
- Case study:Floodplain recreation on the Montone River at the confluence with the Rabbi Stream + (Montone)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Montvaux)
- Case study:Morava restoration project + (Morava)
- Case study:De-culverting Moselle Brook at Lordship Recreation Ground + (Moselle Brook)
- Case study:Moselle Brook - Brook Road + (Moselle Brook)
- Case study:Mulkear Life Project + (Mulkear River)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (Mun)
- Case study:River Mun Community Nature Reserve + (Mun)
- Case study:Biomura LIFE06NAT/SI/000066 + (Mura River)
- Case study:Restoration of Myllypuro brook + (Myllypuro brook)
- Case study:Afon Merin Natural Process Restoration + (Mynach - headwaters to confluence with Rheidol)
- Case study:Restoration of Naarkoski Torrent + (Naarkoski Torrent)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Nagy-Pándzsa)
- Case study:Weir demolition in river Nansa, Cantabria + (Nansa)
- Case study:The Pentney Restoration Project + (Nar DS Blackborough Drain)
- Case study:Emmanuel’s Common Reconnection Project + (Nar DS Blackborough Drain)
- Case study:Nar SSSI project + (Nar to confl with Blackborough Drain)
- Case study:West Lexham Rehabilitation Project + (Nar to confl with Blackborough Drain)
- Case study:Castle Acre Rehabilitation Project + (Nar to confl with Blackborough Drain)
- Case study:Narborough Rehabilitation Project + (Nar to confl with Blackborough Drain)
- Case study:River Nar Restoration Project + (Nar to confl with Blackborough Drain)
- Case study:River Nar, Mileham River Restoration Project + (Nar to confl with Blackborough Drain)
- Case study:River Nar Castle Acre Common WEG project + (Nar to confl with Blackborough Drain)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Narcea)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Negro)
- Case study:River Nene Nature Improvement Area + (Nene)
- Case study:Resilient River + (Nene)
- Case study:River Nent: Abandoned Metal Mines + (Nent from Source to South Tyne)
- Case study:Thames 21 Salmons Brook Diffuse Pollution Urban Project + (New River GB806100111)
- Case study:Force Crag Mine Remediation + (Newlands Beck)
- Case study:Diversion of the River Nith + (Nith)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (Nora)
- Case study:Cumbria Angler Engagement + (North Cumbria)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (North Gwash)
- Case study:Markway Stream Restoration + (Ober Water)
- Case study:Odder Stream Restoration + (Odder)