Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bastion Maria (QUERCUS) + (Dommel)
- Case study:Mains of Dyce + (Don)
- Case study:Hadfield Weir Fish Pass + (Don from River Don Works to River Rother)
- Case study:Sheffield Lower Don Valley Flood Defence Project + (Don from River Loxley confl to River Don Works)
- Case study:Oude Leij + (Donge)
- Case study:Restoring the River Doquette to its original bed + (Doquette)
- Case study:Kleblach-Side channel + (Drava)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Drava)
- Case study:Water and Life for Drava and Vuka + (Drava)
- Case study:Revitalisation of branches ’Boros Dráva and Drávakeresztúri’ + (Drava)
- Case study:Gastersche Diep + (Drentsche Aa)
- Case study:Taarlosche Diep + (Drentsche Aa)
- Case study:Zeegserloopje + (Drentsche Aa)
- Case study:Anloërdiepje + (Drentsche Aa)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (Drugeon)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Drèsine)
- Case study:Improving water quality in Loweswater + (Dub (Park) Beck)
- Case study:River Dulais Restoration Project + (Dulais - conf with Ddu to confluence with Tywi)
- Case study:Dunston Beck Restoration + (Dunston Beck)
- Case study:Diffusing the Issue in rural Ribble - Easington + (Easington Brook)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (Easter Alps)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Eau Blanche)
- Case study:River Ebbw Bank Stabilisation + (Ebbw R - conf Ebbw Fach R to Maes-glas)
- Case study:Lunterse Beek + (Eem)
- Case study:Heiligenbergerbeek + (Eem)
- Case study:Abbey Brook Weir + (Eglwyseg)
- Case study:Restoration project of the degraded area of the Molí source environment and improvement of river areas and adjacent riparian formations + (El Fluviá)
- Case study:Ems floodplain + (Ems)
- Case study:Upper Emscher + (Emscher)
- Flood detention basin (HRB) Ickern-Mengede + (Emscher)
- Case study:Restoration of Enningdalsälv River + (Enningdal River)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Enns)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (Enns)
- Case study:LIFE IP IRIS Enns Mandling Restoration + (Enns)
- Case study:Bleinheim Palace Project + (Evenlode (Bledington to Glyme confluence))
- Case study:Upper Welland Water Friendly Farming Project + (Eye Brook)
- Case study:Fairham Brook Restoration Project + (Fairham Brook Catchment (trib of Trent))
- Case study:Removal of the Fatou dam on the Beaume river + (Fatou Beaume)
- Case study:River North Esk Maintenance + (Firth of Forth)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Fiume ninfa)
- Case study:Emergency works after breach on Lough Neas Drain (Cloghcor) + (Foyle)
- Case study:Buzzards Mouth Creek + (Friars Gate Stream)
- Case study:Koningsdiep + (Friese Wateren)
- Case study:Linde + (Friese Wateren)
- Case study:Moreton Channel Gravel Reprofiling + (Frome Dorset (Lower) & Furzebrook Stream)
- Case study:River Frome Rehabilitation Plan + (Frome Dorset (Lower) & Furzebrook Stream)
- Case study:Unit 1b - Long Bridge to Downstream of Louds Mill + (Frome Dorset (Lower) & Furzebrook Stream)
- Case study:Unit 4 - North Channel Phase 1 + (Frome Dorset (Lower) & Furzebrook Stream)
- Case study:Louds Mill (Downstream)m Enhancement + (Frome Dorset (Lower) & Furzebrook Stream)
- Case study:Bockhampton Enhancement + (Frome Dorset (Lower) & Furzebrook Stream)
- Case study:Lower Bockhampton + (Frome Dorset (Lower) & Furzebrook Stream)