Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Ceresone – Tesina Padovana / Tergola)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Ceresone – Tesina Padovana / Tergola)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Ceresone – Tesina Padovana / Tergola)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Ceresone – Tesina Padovana / Tergola)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Charentonne)
- Case study:Little Waltham Meadows Back Channel creation + (Chelmer (Upper))
- Case study:Meades water garden regeneration project + (Chess)
- Case study:The Babina Restoration Project + (Chilia Branch)
- Case study:The Cernovca Restoration Project + (Chilia Branch)
- Case study:Ching Brook at Walthamstow Greyhound Stadium + (Ching Brook)
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) + (Chícamo)
- Case study:Restoration in the lower reach of the Cinca River + (Cinca)
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge + (Clauge)
- Case study:Lowdham NFM + (Cocker Beck catchment (trib of Trent))
- Case study:River Cole- Life Project + (Cole (Bower Bridge to Thames) including Coleshill)
- Case study:Essex Healthy Headwaters River Restoration Project + (Colne (Gt. Yeldham - Doe's Corner))
- Case study:Watford FC / Hospital + (Colne (from Confluence with Ver to Gade))
- Case study:Poyle channel enhancement and weir removal + (Colne Brook (from confluence with Alderbourne to confluence with Horton Brook))
- Case study:Colne Water Restoration Project + (Colne Water - Trawden Bk to Wanless Water)
- Case study:Colne Brook + (Colne and GUC (from confluence with Chess to Ash))
- Case study:Habitat Improvements on the River Colne at West Drayton + (Colne and GUC (from confluence with Chess to Ash))
- Case study:Fishery/habitat enhancement on the Grand Union Canal + (Colne and GUC (from confluence with Chess to Ash))
- Case study:Uxbridge Moor Backwater + (Colne and GUC (from confluence with Chess to Ash))
- Case study:Refilling the meanders of the Colostre + (Colostre)
- Case study:Enler River enhancement project + (Comber)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Congost)
- Case study:Partial removal of a weir on La Corrèze river in the town of Tulle + (Corrèze)
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon + (Couasnon)
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Crane (including part of the Yeading Brook))
- Case study:Crane Park + (Crane (including part of the Yeading Brook))
- Case study:Mill Road Weir + (Crane (including part of the Yeading Brook))
- Case study:Big Yellow + (Crane (including part of the Yeading Brook))
- Case study:Hospital Bridge Road + (Crane (including part of the Yeading Brook))
- Case study:Cranford Park Phase 2 + (Crane (including part of the Yeading Brook))
- Case study:The Mid River Crane - Aquatic Refuge Identification Plan + (Crane (including part of the Yeading Brook))
- Case study:Peffery Project Phase 3 + (Cromarty Firth)
- Case study:Cudworth dyke restoration project + (Cudworth Dyke from Source to River Dearne)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Cuenca del Cinca)
- Case study:Bird reserve “El Clot” (Tarragona) + (Cuenca del Ebro)
- Case study:Bird reserve “Riet Vell” (Tarragona) + (Cuenca del Ebro)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (Cuenca del Ebro)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Cuenca del Júcar)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Cuenca del Júcar)
- Case study:Bird reserve “Los Albardales” (Madrid) + (Cuenca del Manzanares)
- Case study:Albany Park + (Cuffley Brook and Turkey Brook)
- Case study:The South Hams River Improvement Project (SHRImP) + (DART)
- Case study:The Dart and Teign River Improvement Project (DTRIP) + (DART)
- Case study:Restoration of the previous riverbed of the Dadon + (Dadon)
- Case study:Regelsbrunner Aue + (Danube)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Danube)
- Case study:Conservation of alluvial + (Danube)