Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Meden response to diffuse pollution + (Nottinghamshire Wildlife Trust)
- Case study:Twineham Weir Removal & In-channel Enhancements + (Ouse & Adur Rivers Trust)
- Case study:Broadwater Brook + (Ouse & Adur Rivers Trust)
- Case study:Spring Meadow Meander Restoration + (Ouse and Adur Rivers Trust)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Ouse and Adur Rivers Trust)
- Case study:River Adur - Shipley weir removal + (Ouse and Adur Rivers Trust)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (Ouse and Adur Rivers Trust)
- Case study:Inchewan Burn Bed restoration + (Perth Council)
- Case study:Welton Farm Landfill/Riverbank Works + (Perth and Kinross Council)
- Case study:The Ciobarciu Wetland Project + (Prut - Barlad River Basin Authority)
- Case study:Swindale Beck Restoration + (RSPB)
- Case study:Rheinauen bei Rastatt + (Regierungspraesidium Karlsruhe)
- Case study:Ecological Restoration of Natural Lake Pochina + (Regional Agenty for Environmental Protection Galati (RAEP Galati))
- Case study:Ecological Restoration of Vlascuta Lake + (Regional Agenty for Environmental Protection Galati (RAEP Galati))
- Case study:Ecological Restoration of Mata-Radeanu Complex + (Regional Agenty for Environmental Protection Galati (RAEP Galati))
- Case study:Bourne End Recreation Ground River Enhancement Project + (Revive the Wye)
- Case study:Room for the River + (Rijkswaterstaat Oost-Nederland)
- Case study:Lek Bij Everdingen + (Rijkswaterstaat Waterdienst)
- Case study:Resilient River + (River Nene Regional Park)
- Case study:Saving Chiswick Eyot + (Royal Holloway University of London)
- Case study:South Calder Water deculverting and habitat restoration + (Scottish Environment Protection Agency (SEPA))
- Case study:Rinya water-system reconstruction + (South-Transdanubian Environmental Protection and Water Management Directorate)
- Case study:Allt Lorgy River Restoration + (Spey Catchment Initiative)
- Case study:River Calder Large Wood Structure installation + (Spey Catchment Initiative)
- Case study:Lippeaue Klostermersch + (Staatliches Umweltamt Lippstadt)
- Case study:Buiten Ooij + (Staatsbosbeheer)
- Case study:Restoration of the longitudinal continuity along the Canche and its classified tributaries + (Syndicat mixte pour le SAGE de la Canche)
- Case study:Remediation and revitalization of Séd-Nádor stream + (Séd-Nádor 2009 Consortium)
- Case study:Hampton Court Palace + (Thames Landscape Strategy, Thames21)
- Case study:River Pool Linear Park Enhacement + (Thames21)
- Case study:Rewilding the Rom + (Thames21)
- Case study:Chinbrook Meadows Wetlands + (Thames21)
- Case study:The Babina Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Cernovca Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Fortuna Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:The Holbina-Dunavat Restoration Project + (The Danube Delta Biosphere Reserve Authority, Tulcea)
- Case study:River Avon Our Water Environment + (Tomintoul & Glenlivet Landscape Partnership)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Tulcea Forestry Administration)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Tulcea Forestry Administration)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3 + (Tulcea Forestry Administration)
- Case study:Haltwhistle burn; a total catchment approach + (Tyne Rivers Trust)
- Case study:River Don Restoration project + (Tyne Rivers Trust)
- Case study:Vindel River LIFE + (Umeå University)
- Case study:Restoration of Grobruelva + (Vannområdet Indre Oslofjord Vest)
- Case study:Welland for People and Wildlife Project + (WRT)
- Case study:Regelsbrunner Aue + (WWF Austria)
- Case study:Recreation of a low-flow sinuous channel in an urban stretch of the Montvaux stream + (Water Agency)
- Case study:Recreation of a sinuous low-flow channel in the Merloz + (Water Agency)
- Case study:Restoration of the previous riverbed of the Dadon + (Water Agency)
- Case study:Day Brook Restoration - Gedling + (WatersideCare)
- Case study:Ennerdale Mill Weir Removal + (West Cumbria Rivers Trust)