Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Grantham Blue Green - Urban Reach + (Native Crayfish / Brown Trout)
- Case study:Wyndham Park, Grantham + (Native Crayfish / Brown Trout)
- Case study:Manthorpe Floodplain Reconnection + (Native Crayfish / Brown Trout)
- Case study:Little Ponton + (Native Crayfish / Brown Trout)
- Case study:Syston and Barkston Restoration + (Native Crayfish and Brown Trout)
- Case study:Voorste Nete at Dessel + (Spined loach)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Ardea purpurea)
- Case study:Rodley weir by pass channel + (Otter)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Brown Trout)
- Case study:Braid Burn at Inch Park + (Otter (Lutra lutra))
- Case study:Tolka Valley Park at Finglas + (Otter (Lutra lutra))
- Case study:Tolka Valley Park erosion control + (Otter (Lutra lutra))
- Case study:Whit Beck River Restoration Project + (Atlantic salmon (Salmo salar))
- Case study:Welton Farm Landfill/Riverbank Works + (Otter (Lutra lutra))
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Great Bittern (Botaurus Stellaris))
- Case study:Harbertonford Flood Alleviation Scheme + (Otter and common dormouse (protected); Atlantic salmon)
- Case study:Upper Witham Restoration + (Brown Trout)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Ardea purpurea)
- Case study:Fish pass on the Najerilla River + (Brown trout (Salmo trutta))
- Case study:Inturia dam removal + (Phoxinus bigerri)
- Case study:Saving Chiswick Eyot + (Himalayan balsam (Impatiens glandulifera ))
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the Johnsbach Beck restoration + (Alcedo atthis)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Alcedo atthis)
- Case study:Černý potok stream restoration scheme + (Menyanthes trifoliata)
- Case study:Bird reserve “O Grove” (Pontevedra) + (Puffinus mauretanicus)
- Case study:Bird reserve “El Clot” (Tarragona) + (Emberiza schoeniclus witherbyi)
- Case study:Bird reserve “Riet Vell” (Tarragona) + (Plegadis falcinellus)
- Case study:Amerongse Bovenpolder + (oyster catchers)
- Property:Species of interest + (many protected species)
- Case study:Bird Reserve “Tancat de la Pipa” (Valencia) + (Ardea purpurea)
- Case study:Diversion of the River Nith + (Primarily salmon and brown trout.)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Protected - Freshwater pearl mussel (Margaritifera margaritifera); Invasive - Phytophthora alni)
- Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake + (Great Bittern (Botaurus Stellaris))
- Case study:TerraSeixe + (Quercus canariensis (Monchique oak))
- Case study:LIFE RISORGIVE – Fontane Marzare + (Alcedo atthis)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Alcedo atthis)
- Case study:LIFE RISORGIVE – Bacino Castellaro + (Alcedo atthis)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Alcedo atthis)
- Case study:River Nar Castle Acre Common WEG project + (Ranunculus)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (native or typical flora of the temporary wetlands of the Camargue area)
- Case study:Restoration project of riparian buffer of the Sesia river + (Reynoutria japonica)
- Case study:Creating a fishpass at Włocławek dam + (Acipenser oxyrinchus)
- Case study:Abbey Brook Weir + (Salmon)
- Case study:Borrowash fish pass + (Salmon)
- Case study:Dam removal in River Stenån + (The freshwater pearl mussel)