Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Goldrill Beck River Restoration + (partnership working with organisations including the EA)
- Case study:Kirkstone Beck River Restoration + (partnership working with organisations including the EA)
- Case study:Upper Emscher + (Information for the public)
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias) + (Information panels for people)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (New pahts near the river)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (New paths near the river)
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Information panels for people)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Hold information meetings)
- Case study:Southington River Restoration Project + (One of the most enjoyable parts of this re … One of the most enjoyable parts of this restoration was working with and involving the local community. This came about because of the experiences gained in 2016. In 2016 given the location of the restoration through Overton village the owner and contractor where advised to let as many people know about the project so they knew what was happening. While this instruction was carried out many local people where still shocked as to the scale of works. Many non-indigenous tree where felled to allow light into a previously over shaded channel and consequently the view for many locals changed dramatically. Following local concerns Heb Leman the Project Officer gave a presentation to the local community on the background to the Strategy and consequently why the works where being carried out. After this the local community embraced what was being done and wanted to be informed of any future works. Once the landowner had agreed to continue the works upstream in 2017 and remove the structure a guided tour was arranged for residents. This showed them the already beneficial changes to the restored channel and informed them of what was going to happen in 2017. To involve them further it was decided that the Overton Biodiversity Society would carry out the water vole surveys prior to the work and that the community would be kept informed of the new works via the community Face Book page. The landowner also agreed that because of the historic and archaeological interest in the site that Overton Archaeological Society could also carry out a dig during the works. Consequently throughout the works local archaeologist worked alongside County archaeologist piecing together the history of the site. On completion of the works all the finds and the long history of the site where presented to the local community through an evening of presentations on the restoration itself and the history of the site. This event was attended by at least 120 people and was very well received. From this also came further potential restoration works with others wanting to be involved. The whole experience also engaged the wider community with the landowner for the benefit of all. Other external inputs came from colleagues specialising in fish passage. This was a technically challenging project and the finished project had to enable up and downstream fish passage. Their knowledge was invaluable in allowing this happen.ge was invaluable in allowing this happen.)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Organization of events)
- Case study:LIFE ECORICE - Vercelli rice fields + (Participatory process engaging local managers)
- Case study:Stony Stratford Sluices Bypass Channel + (Partnerships)
- Case study:Swindale Beck Restoration + (Community involvement)
- Case study:River Trent, Bucknall Park + (Partnerships)
- Case study:Austria Urban River Landscape - Urban River Landscape Graz + (Planning workshop)
- Case study:Reopening of Mjølløst stream + (Planting riparian vegetation with school pupils.)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Population’s awareness raising for the river habitat.)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Awareness raising by a sign)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (Promotion of meeting and consultation spaces)
- Case study:BALLYMONEY RIVERSIDE PARK RESTORATION PROJECT + (Community Education)
- Case study:Barn Elms Wetland Centre, South West London + (Visitor centre)
- Case study:Beverley Park + (Public amenity and perception)
- Case study:Pymmes Park Wetlands + (Community involvement)
- Case study:Firs Farm Wetlands + (Public amenity and perception)
- Case study:Rio Tepice urban restoration + (Public green area)
- Case study:QUERCUS Dee + (Recreation)
- Case study:Refilling the meanders of the Colostre + (Public meeting)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Public meeting)
- Case study:Septic Tank Survey in the Clun Forest + (Public meeting)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Raise awareness of the problems pearl mussels face among land managers and river users)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Realization of press conferences)
- Case study:Regeneration of the banks of the river Mape + (Recovering the historical and cultural heritage linked to the river)
- Case study:Rinya water-system reconstruction + (Recreation)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (Recreation)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Recreation)
- Case study:Water and Life for Drava and Vuka + (Recreation)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Recreation)
- Case study:Salzano wetland and Marzenego river restoration project + (Improved public access)
- Case study:Conservation of alluvial + (Recreation)
- Case study:QUERCUS Dee + (Recreation)
- Case study:Bastion Maria (QUERCUS) + (Recreation)
- Case study:Friary Park + (Recreation)
- Case study:Bury Lodge Wetlands + (Recreation)
- Case study:Elmbridge Meadows + (Aesthetics)
- Case study:Friern Barnet Former Sewage Works + (Aesthetics)
- Case study:Pymmes Brook and new river crossing point + (Recreation)
- Case study:Albany Park + (Recreation)
- Case study:Mill Pool + (Redesign of riverside seating area to improve outlook and convey information about historic importance of the Mill Pool.)
- Case study:Removal of the Kernansquillec dam over the River Léguer + (Rehabilitation of site by local associations)
- Case study:Herefordshire Asset Restoration Project (HARP) + (Resolving angler/ canoeist conflict)
- Case study:River Hogsmill Restoration Project + (Restoration of a footbridge)
- Case study:Welland for People and Wildlife Project + (Community Events)
- Case study:Urban River Enhancement Scheme (URES) in Burnley + (Community Events)