Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (agro pontino)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (aguanaz)
- Case study:Aaijen- Removal of bank fixation + (aijen)
- Case study:Restoration of the river Akerselva + (akerselva)
- Case study:INTERREG MED WETNET- Albufera de Valéncia Memorandu of Cooperation for Wetland Contract + (albufera de valencia)
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) + (aldea el nacimiento)
- Case study:Alkborough tidal defence scheme + (alkborough)
- Case study:Craigton Riparian and NFM Orchard Planting + (allan water)
- Case study:Alma Road Rain Gardens + (alma road, enfield)
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer + (alòs de balaguer)
- Case study:Amerongse Bovenpolder + (amerongse bovenpolder)
- Case study:Biomura LIFE06NAT/SI/000066 + (and melinci)
- Case study:Anloërdiepje + (anloërdiepje)
- Case study:Anton Crescent Wetlands Regeneration + (anton crescent wetlands)
- Case study:Apelnäs fishway at River Rolfså + (apelnäs hydropowerplant at river storån)
- Case study:Restoration of the stream of the Partido + (arroyo del partido)
- Case study:Klassiek beekherstel Astense Aa + (astense aa)
- Case study:Aubourn Rock Ramp and Habitat Works + (aubourn rock ramp and habitat works)
- Case study:River Avon Restoration Project + (avon)
- Case study:Salmonid, coarse fish and wetland bird habitat and flood plain linkage project, Hampshire Avon + (avon tyrell, burcombe, stapleford, quidhampton)
- Case study:Avon Barriers Project + (avon water)
- Case study:Avon Barriers Project: Ferengair Weir + (avon water: ferengair weir)
- Case study:The Axe and Exe River Improvement Project (AERIP) + (axe and exe catchments)
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara. + (azud de buendía)
- Case study:Weir demolition in river Nansa, Cantabria + (azud de camijares)
- Case study:Demolition of weir on the River Nora, Nalón Basin + (azud de nora en guyame)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (azud del lozoya antes de la presa de pinilla)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (babingley river)
- Case study:Babingley River at Hillington + (babingley river at hillington)
- Case study:Historic Mill Restoration Project + (bachmanns water mill (river vida, tonder))
- Case study:LIFE RISORGIVE – Bacino Castellaro + (bacino castellaro)
- Case study:Zújar river restoration in the reach between the ford of "Entrerríos" and its mouth, Badajoz. + (badén del zújar (badajoz))
- Case study:Zújar river restoration in the reach between the ford of "El Espolón" and the Chapel of St Mary of Zújar , Badajoz. + (badén del zújar (badajoz))
- Case study:Zújar river restoration in the reach between the dam and the ford of "El Espolón" , Badajoz. + (badén del zújar (badajoz))
- Case study:Zújar river restoration in the reach between the Chapel of St Mary of Zújar and the ford of "Entrerríos", Badajoz. + (badén del zújar (badajoz))