Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (Río Canaletes en el municipio de Horta de San Joan)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Río Congost)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Río Guadajira, arroyo del Entrín Verde, arroyo del Golfín y arroyo Colorado de Valdehombres)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (Río Ripoll a su paso por el municipio de Ripollet)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Río Segura desde Almadenes hasta Ojós (SEG7) y Río Segura desde el embalse del Cenajo hasta Almadenes (SEG6))
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Río Serpis entre el embalse de Beniarrés y el azud de la Reprimala)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (Río Tordera)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Río Tordera en Sant Celoni)
- Case study:Fluvial river restoration of Tordera in Tordera + (Río Tordera en Tordera)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Río Viejas)
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (Ríos Llobregat y Cardener en la comarca del Bages)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Ríos Negro, Fontirín, Sapo y arroyos de Carballades y Trepollar)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Røssåga)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (Saint Etienne du Vigan)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Sallent)
- Case study:Saltburn Gill ironstones mines + (Saltburn Gill Nature Reserve)
- Case study:Stage 0 channel restoration + (Saltwells NNR)
- Case study:Salzano wetland and Marzenego river restoration project + (Salzano wetland and Marzenego river)
- Case study:Lower Aurino river: San Giorgio di Brunico riverbed widening + (San Giorgio di Brunico)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (San Tomè (Forlì))
- Case study:Restoration of a stretch of the river of Santa Coloma + (Santa Coloma de Farners)
- Case study:Reconnection of a secondary arm of the Rhine: the Schafteu + (Schafteu)
- Case study:Wyre Riparian Restoration Initiative + (School Lane, Catforth)
- Case study:Scolo Desolino restoration project + (Scolo Desolino)
- Case study:Sculthorpe Moor Restoration Scheme + (Sculthope Moor)
- Case study:Sediment Pathways Project + (Sediment Pathways Project)
- Case study:TerraSeixe + (Seixe river)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Serquigny public garden)
- Case study:Restoration project of riparian buffer of the Sesia river + (Sesia river (Municipality of Vercelli – location Brarola and Korczak)
- Case study:River Gaywood – Seven Sisters Drain + (Seven Sisters Drain)
- Case study:Lugton Water Fish Barrier Easement + (Sevenacres)
- Case study:Pumlumon Peatland Restoration for Floodwater Management + (Severn, Rheidol, Dyfi and Leri)
- Case study:Rother meander reconnection + (Shopham Loop)
- Case study:Removal of the Ver mill weir on the Sienne River + (Sienne River)
- Case study:Skårhultsdammen bypass channel at River Knipån + (Skårhultsdammen pond)
- Case study:Boosting slivso + (Slivso)
- Case study:Snelle Loop + (Snelle Loop)
- Case study:Snoeijinksbeek + (Snoeijinksbeek)
- Case study:Removal of the Brosses weir on the Soanan River + (Soanan River)
- Case study:Soest - Optimisation of the pSCI “Lippe floodplain between Hamm and Hangfort + (Soest)
- Case study:Remeandering of the Mardereau stream at Sorigny + (Sorigny)
- Case study:Restoration of streams Chico Soto, Soto Grande and Arroyo de la Laguna de los Reyes + (Soto Chico, Soto Grande y Laguna de los Reyes)
- Case study:Creation and restoration of a riparian zone + (Soto de Campollano)
- Case study:South Esk restoration + (South Esk)
- Case study:The South Hams River Improvement Project (SHRImP) + (South Hams River)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (Southwest Coast SCI – Portugal (Natural Park of Southwest Alentejo and Vicentina Coast (PNSACV).)
- Case study:Sowe Valley Project + (Sowe Valley)
- Case study:Springendalse Beek + (Springendalse Beek)
- Case study:The South Cornwall River Improvement Project + (St Neot; Rivers Par, St Austell, Mevagissey, Warleggan, Avon, Crinnis, Polmear stream, Gorran Stream, Portmellon Stream and Bokiddicks Stream)
- Case study:The South Cornwall River Improvement Project - St. Austell + (St. Austell)
- Case study:Stainby Road, Colsterworth + (Stainby Lane Colsterworth)