Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:HPP Blanca + (River Sava near settlement Blanca)
- Case study:River Skerne- Life project + (River Skerne at Haughton le Skerne)
- Case study:River Slea Rehabilitation + (River Slea)
- Case study:River Somer channel enhancement, Midsomer Norton + (River Somer at Midsomer Norton)
- Case study:Pearls in Peril LIFE+ GB Project - River South Esk + (River South Esk)
- Case study:Pearls in Peril LIFE+ GB Project - River Spey + (River Spey)
- Case study:River Tame at Salford Park ("SMURF") + (River Tame at Salford Park)
- Case study:River Tame in Perry Hall playing fields ("SMURF") + (River Tame in Perry Hall playing fields)
- Case study:Southington River Restoration Project + (River Test)
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe + (River Thames)
- Case study:Petersham Meadows + (River Thames)
- Case study:River Tutt Restoration Project + (River Tutt Catchment)
- Case study:River Valency at Boscastle + (River Valency at Boscastle)
- Case study:Welland for People and Wildlife Project + (River Welland and its tributary the River Jordan (Market Harborough area))
- Case study:Drayton + (River Welland downstream of Ashley gauging station)
- Case study:Wensum River Restoration and Floodplain Enhancement, Pensthorpe + (River Wensum)
- Case study:River Wid restoration scheme + (River Wid)
- Case study:Sherborne Windrush Restoration Project + (River Windrush)
- Case study:River Witham Great Ponton + (River Witham Great Ponton)
- Case study:River of Life + (River of Life)
- Case study:Eden Crayfish Restoration Project + (Rivers Leith, Lyvennet, Lowther, Hoff and Helm Becks, Croglin Water and Hayber Beck)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (Rivers Lumburn, Walkham and Lower Tavy)
- Case study:The South Cornwall River Improvement Project - River Par + (Rivers Par)
- Case study:Rodley weir by pass channel + (Rodley Nature Reserve)
- Case study:Roe and Ive + (Roe and Ive)
- Case study:LIFE RISORGIVE – Roggia Girosa + (Roggia Girosa)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Roggia Tergola)
- Case study:Biologisk återställning i Rolfsåns vattensystem + (Rolfsån River)
- Case study:Rookery Brook Pollution Prevention Project + (Rookery Brook)
- Case study:Rye Harbour Farm Regulated Tidal Exchange + (Rother Estuary)
- Case study:Rottal Burn + (Rottal Burn)
- Case study:Meander reinstatement on the River Wensum at the Ryburgh Loop + (Ryburgh Loop)
- Case study:Habitat and water flow restoration on River Rábca + (Rábca)
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (Río Canaletes en el municipio de Horta de San Joan)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Río Congost)
- Case study:River restoration in the irrigation area Lobón (Badajoz) + (Río Guadajira, arroyo del Entrín Verde, arroyo del Golfín y arroyo Colorado de Valdehombres)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (Río Ripoll a su paso por el municipio de Ripollet)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Río Segura desde Almadenes hasta Ojós (SEG7) y Río Segura desde el embalse del Cenajo hasta Almadenes (SEG6))
- Case study:Restoration project in Serpis River in the tt.mm. Lorcha (Alicante province) and Villalonga (Valencia province) + (Río Serpis entre el embalse de Beniarrés y el azud de la Reprimala)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (Río Tordera)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Río Tordera en Sant Celoni)
- Case study:Fluvial river restoration of Tordera in Tordera + (Río Tordera en Tordera)
- Case study:Restoration of Viejas River from the outlet of the fish farm to its mouth + (Río Viejas)
- Case study:"Rio Verde II". Restoration of riparian forest and the rivers Llobregat and Cardener + (Ríos Llobregat y Cardener en la comarca del Bages)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Ríos Negro, Fontirín, Sapo y arroyos de Carballades y Trepollar)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Røssåga)
- Case study:Removal of a dam on the Allier river in Saint-Etienne-du-Vigan + (Saint Etienne du Vigan)
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Sallent)
- Case study:Saltburn Gill ironstones mines + (Saltburn Gill Nature Reserve)
- Case study:Stage 0 channel restoration + (Saltwells NNR)
- Case study:Salzano wetland and Marzenego river restoration project + (Salzano wetland and Marzenego river)