Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Llobregat river restoration + (Pallejà)
- Case study:Revitalisation of Nagy-Pándzsa watersystem + (Pannonhalma)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Pantanello (Municipality of Cisterna di Latina))
- Case study:Papermill Weir Section in-channel restoration + (Papermill weir section)
- Case study:St Austell Bay Resilient Regeneration Project (StARR), Cornwall + (Par and Sandy)
- Case study:The Manzanares River Restoration: Demolition of an obsolete dam and riverine ecosystem rehabilitation + (Paraje del Tranco, Manzanares del Real)
- Case study:Valtellina 2005 – New green system + (Parco della Bosca)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Parque Natural del Alto Tajo)
- Case study:Hills to Levels + (Parrett, Tone, Brue, Axe and West Somerset Streams)
- Case study:Restoring the River Doquette to its original bed + (Percy)
- Case study:The Bulgarian Wetlands Restoration and Pollution Reduction Project + (Persina Nature park, protected site "Kalimok- Brashlen")
- Case study:Removal of a pond weir in a tributary of Petersbach + (Petite-Pierre Nord forest - Butten)
- Case study:Slowing the Flow at Pickering + (Pickering Beck and River Seven)
- Case study:Plough Hill Farm Meander and Wet meadow restoration + (Plough Hill)
- Case study:Ecological Restoration of Natural Lake Pochina + (Pochina Lake)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Podutik)
- Case study:The South Cornwall River Improvement Project – Polmear stream + (Polmear stream)
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II) + (Porqueres)
- Case study:The South Cornwall River Improvement Project – Portmellon Stream + (Portmellon Stream)
- Case study:Removal of Maisons-Rouges dam over the River Vienne + (Ports and Nouâtre)
- Case study:Brackenhurst Natural Flood Management + (Potwell Dyke)
- Case study:Pow Burn Restoration Project + (Pow Burn (Farnell to Powmouth))
- Case study:Restoration of Rusenski Lom River near Ivanovo + (Protected area "Lomovete")
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (Protection site "Zlato pole")
- Case study:Environmental regeneration project in Magro river bed + (Proyecto de restauración del río Magro desde Caudete de Las Fuentes hasta el Embalse de Forata)
- Case study:Pymmes Park Wetlands + (Pymmes Park Wetlands)
- Case study:Restoring Brent Rivers and Communities + (Quainton Street Open Space)
- Case study:Cudworth dyke restoration project + (Rabbit Ings)
- Case study:Beekherstel Ramsbeek + (Ramsbeek)
- Case study:River Ray Rural Flooding + (Ray)
- Case study:River Roding at Ray Lodge Park + (Ray Lodge Park)
- Case study:Reest + (Reest)
- Case study:Reestvervangende leiding + (Reestvervangende leiding)
- Case study:Regelsbrunner Aue + (Regelsbrunner Aue)
- Case study:Refilling the meanders of the Colostre + (Regional Natural Park of Verdon)
- Case study:Restoration of Reinikkalankoski torrent + (Reinikkalankoski torrent)
- Case study:Remeandering of the Drésine and of the Remoray stream + (Remoray)
- Case study:Restoration project in Turia River + (Restauración del río Turia en los municipios de Gestalgar, Bugarra y Pedralba (Valencia))
- Case study:Restoration project in Verde River + (Restauración del río Verde en los municipios de Benimodo, Massalvés, Alberique y Alzira (Valencia))
- Case study:River Calder improvement project + (Ribble Catchment)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Ribble and Loud Catchment)
- Case study:Improvement of the River Varde at the Wadden Sea estuary + (Ribe amt)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (Riera de Reixac)
- Case study:Environmental improvement project of the stream of Ruby + (Riera de Rubí a su paso por el núcleo de Rubí)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (Riera de Vallcorba en Quirze del Vallés)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (Riera de Vallicrosa)
- Case study:River restoration project of the stream of Vallvidrera + (Riera de Vallvidrera en el término municipal de Sant Cugat)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (Riera de la Val d'Horta)
- Case study:Bird reserve “Riet Vell” (Tarragona) + (Riet Vell)
- Case study:Rijkelse Bemden - River bed widening + (Rijkelse Bemden)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Rio San Martino near Scorzè)