Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Re-connecting Meanders at Cranebank on the River Crane + (Cranebank)
- Case study:The South Cornwall River Improvement Project – Crinnis + (Crinnis)
- Case study:Nigg Bay Managed Realignment Scheme + (Cromarty Firth, Highland Region)
- Case study:Cuckolds Haven Nature Area + (Cuckold's Haven)
- Case study:Cumbria River Restoration Strategy + (Cumbria River Restoration Strategy)
- Case study:Removal of the Cussy weir on the Maria stream + (Cussy)
- Case study:Restoration of the previous riverbed of the Dadon + (Dadon)
- Case study:Darley Abbey Fish Pass Project + (Darley Abbey)
- Case study:Lower Darwen Weir Removal + (Darwen)
- Case study:Debenham Flood Storage Options - flood modelling and economic assessment + (Deben)
- Case study:Waldringfield Flood Defence Scheme, Suffolk + (Deben Estuary)
- Case study:River Dee + (Dee Restoration)
- Case study:The River Deerness Project + (Deerness)
- Case study:River Kennet Restoration at Durnsford + (Denford Common)
- Case study:Deurningerbeek + (Deurningerbeek)
- Case study:Dinkel Noord + (Dinkel Noord)
- Case study:Living Vechte-Dinkel + (Dinkel-Zuid)
- Case study:Deculverting Djupsund stream + (Djupsundbekken)
- Case study:Brightside Weir Fish Pass + (Don)
- Case study:De Doorbraak + (Doorbraak)
- Case study:Dove Weir removal + (Dovedale)
- Case study:Letting the Dove Flow 2 + (Dovedale)
- Case study:Downham Playing Fields + (Downham Playing Fields)
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area + (Doñana National Park Area)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1 + (Dranov 1 Island)
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2 + (Dranov 2 Island)
- Case study:Water and Life for Drava and Vuka + (Drava-Danube area)
- Case study:Revitalisation of branches ’Boros Dráva and Drávakeresztúri’ + (Drava-Danube area)
- Case study:Remeandering of the Drugeon and integrated management of its catchment + (Drugeon valley)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (Duddon catchments)
- Case study:Restoration of Szárazerdei river branch + (Dunakiliti)
- Case study:Dunston Beck Restoration + (Dunston Beck)
- Case study:Dysart Park, Grantham Habitat Improvement + (Dysart Park, Grantham Habitat Restoration)
- Case study:River Avon at East Chisenbury + (East Chisenbury)
- Case study:Eddleston water + (Eddleston water)
- Case study:Beekherstel Eefsebeek + (Eefsebeek)
- Case study:Bird reserve “El Clot” (Tarragona) + (El Clot)
- Case study:Eldbäcken + (Eldbäcken)
- Case study:Ems floodplain + (Ems Floodplain)
- Case study:Enler River enhancement project + (Enler River)
- Case study:Fluvial restoration in River Carrión + (Entre Pino del Río y Fresno del Río)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Erve River)
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation + (Escala de peces en la Central Hidoeléctrica de Frieira)
- Case study:Evenlode Catchment Project + (Evenlode)
- Case study:Exmoor Mires Partnership + (Exe)
- Case study:Removal of the Fatou dam on the Beaume river + (Fatou)
- Case study:Land acquisition on the banks of the Ouche River + (Fauverney)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Felsőszentmárton)
- Case study:Bird reserve “Finca San Miguel” (Huesca) + (Finca San Miguel)
- Case study:Firs Farm Wetlands + (Firs Farm Wetlands)
- Case study:The Holbina-Dunavat Restoration Project + (Fishpond Holbina-Dunavat)