Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species)
- Case study:River Witham Great Ponton + (Fencing)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (conservation and restoration of ponds)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Recovery)
- Case study:Beverley Brook d/s of Rock’s Lane + (Tree planting)
- Case study:LIFE08NAT/IT/000352 CRAINat + (Habitat restoration)
- Case study:Watercress Farm Rewetting Project + (A key achievement of the project was the creation of a new river channel)
- Case study:West End Brook - weir removal and track management + (diversion of flow into surrounding wet woodland)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (shrub vegetation along the stream area)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (ensuring the hydraulic protection of the area from the risk of flooding and sediment from the canals)
- Case study:Restoration of Siuruanjoki River + (Removal of embankments)
- Case study:Sussex Flow Initiative + (establishment of woodland)
- Case study:Investigating the impact of upland conifer afforestation on catchment hydrology at Coalburn, northern England + (establishment of woodland)
- Case study:Brackenhurst Natural Flood Management + (establishment of woodland)
- Case study:Inspiring Water Action in the Torne (iWAIT) + (establishment of woodland)
- Case study:Investigating the Impacts of Upland Land Use Management on Flood Risk at Pontbren, Wales + (establishment of woodland)
- Case study:Investigating the impact of floodplain woodland on flood flows in the River Cary catchment, Somerset + (establishment of woodland)
- Case study:Investigating the interaction between semi-natural floodplain woodland and flood flows at Great Triley Wood + (establishment of woodland)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Implantation of amphibian ponds)
- Case study:The Dart and Teign River Improvement Project (DTRIP) + (Fencing)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (planting of autochthonous vegetation (elms)
- Case study:Upper Witham Restoration + (Bed raising)
- Case study:Goldrill Beck River Restoration + (floodplain reconnection)
- Case study:Belton Floodplain Reconnection and River Restoration + (floodplain roughening)
- Case study:Hills to Levels + (Floodplain reconnection)
- Case study:3Rivers - Lumburn:Walkham:Tavy + (floodplain woodland planting)
- Case study:Watercress Farm Rewetting Project + (A key achievement of the project was the creation of a new river channel)
- Case study:Gilev's Grove reconstruction + (gabions constructions close to the bridge)
- Case study:River Soar Floating Pennywort Eradication + (herbicide spraying)
- Case study:Restoration of Grobruelva + (Removal of retainment structure (Rotubekken))
- Case study:INTERREG MED WETNET – Memorandum of Understanding for the realization of the Wetland Contract for the Vercelli rice plain + (protecting and increasing biodiversity)
- Case study:Environmental Restoration of the Lower Section of the Bembézar River and its River Environment (Phase 1) + (Actions to improve the natural environment: Restoration of the autochthonous riverside vegetation in the sections in which the reedbed is present. It is responsible for the degradation of the autochthonous vegetation)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Implantation of amphibian ponds)
- Case study:Force Crag Mine Remediation + (Vertical flow pond which uses compost)
- Case study:Eastridge Estate restoration project + (lowering river bank)
- Case study:Gunville Phase I + (lowering river bank)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (mowing)
- Case study:Barnes Common improvements + (Tree management)
- Case study:Biomura LIFE06NAT/SI/000066 + (Partially filled river sleeves - restored and cleaned of debris)
- Case study:Craigton Riparian and NFM Orchard Planting + (Creation of wet woodland)
- Case study:River Meden response to diffuse pollution + (Fencing)
- Case study:Ecclesbourne Farm project + (Installing riverside fencing)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (planting of autochthonous vegetation (elms)
- Case study:Letting the Dove Flow 2 + (Improvement of natural flows)
- Case study:Rheinauen bei Rastatt + (reconnection of oxbow)
- Case study:Bird reserve “Riet Vell” (Tarragona) + (Stablish crops of ecologic rice)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Replanting of banks)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Planting of helophytes at the foot of banks)