Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:River Stour habitat enhancements at Great Bradley and Little Bradley + (Tree planting)
- Case study:Glaisdale Beck Restoration Project + (Fencing)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of wetland)
- Case study:River Eye + (Tree management)
- Case study:St Austell Bay Resilient Regeneration Project (StARR), Cornwall + (Floodplain reconnection)
- Case study:The Bowmont Catchment + (Tree planting)
- Case study:Lowdham NFM + (Containment bund to prevent flooding)
- Case study:River Wensum Restoration, Reach 3a Costessey + (Tree planting)
- Case study:Pow Burn Restoration Project + (Creation of inset floodplain)
- Case study:Lowering the weir of the Houël mill on the Leff River + (Trimming of trees)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species)
- Case study:San Giovanni stream restoration upstream San Matteo della Decima + (Vegetation management)
- Case study:Vindel River LIFE + (Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure)
- Case study:Restoration in river Tajo and tributaries after kaolin spillage + (Removal of sediments from the mines)
- Case study:Wummewiesen restoration project + (Extensive planting)
- Case study:River Dulais Restoration Project + (Creation of wetland)
- Case study:Manor Park + (Vegetation management)
- Case study:River Gaywood – Seven Sisters Drain + (Vegetation management)
- Case study:Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura) + (Alloctone species control)
- Case study:Meades water garden regeneration project + (Creation of wetland)
- Case study:Love My River + (Habitat enhancement)
- Case study:Traditioneel Beekherstel Koffiegoot + (Vermoerassing/de beek het bos ingestuurd)
- Case study:Force Crag Mine Remediation + (Vertical flow pond which uses compost)
- Case study:River Soar fish refuge and wetland scrape + (Wader scrape creation)
- Case study:Pearls in Peril LIFE+ GB Project - River Dee + (Riparian planting)
- Case study:Buiten Ooij + (Water release into floodplain in winter)
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA + (Creation of pond)
- Case study:Minsterley Brook Abandoned Metal Mines + (Water treatment methods)
- Case study:River Seaton: Abandoned Metal Mines + (Water treatment methods)
- Case study:Upper Emscher + (Wetland habitat)
- Flood detention basin (HRB) Ickern-Mengede + (Wetland habitat)
- Case study:Barn Elms Wetland Centre, South West London + (Wetland habitat)
- Case study:Knepp Rewilding Project + (Wetland habitat)
- Case study:Gunville Phase I + (Wetland habitat)
- Case study:River Glyme Stratford Restoration + (Wetland habitat)
- Case study:LIFE+ “Sipontine Wetlands” + (Wetland habitat)
- Case study:Chinbrook Meadows Wetlands + (Wetland habitat)
- Case study:West Amesbury + (Wetland restoration)
- Case study:Oasi naturale delle pittime di Cascina Oschiena + (Wetland restoration)
- Case study:Sutcliffe Park + (Creation of pond)
- Case study:Upper Cringle Floodplain Restoration Project + (Lowering of floodplain)
- Case study:LIFE+ Traisen + (Within the construction process the river was extended by 7.6 kilometres and the estuary of the Traisen River was relocated)
- Case study:INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park + (mowing)
- Case study:Watercress Farm Rewetting Project + (A key achievement of the project was the creation of a new river channel)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species)
- Case study:INTERREG MED WETNET – Negotiated Planning Agreement “Wetland Contract of the Caorle lagoon system” + (ensuring the hydraulic protection of the area from the risk of flooding and sediment from the canals)
- Case study:Updated project for the “Environmental Restoration and Urban and Landscape Planning of Cabra River’s High Section (Cordoba) + (planting of autochthonous vegetation (elms)
- Case study:River Witham Great Ponton + (Fencing)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:LIFE Charcos - Conservação de Charcos Temporários na Costa Sudoeste de Portugal (Conservation of Med Temporary Ponds in SW Portugal) + (conservation and restoration of ponds)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Recovery)
- Case study:Beverley Brook d/s of Rock’s Lane + (Tree planting)
- Case study:LIFE08NAT/IT/000352 CRAINat + (Habitat restoration)
- Case study:West End Brook - weir removal and track management + (diversion of flow into surrounding wet woodland)
- Case study:Environmental Restoration of the Riopudio Stream in Sevilla + (shrub vegetation along the stream area)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Implantation of amphibian ponds)
- Case study:Restoration of Siuruanjoki River + (Removal of embankments)
- Case study:Sussex Flow Initiative + (establishment of woodland)