Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Albany Park + (River naturalisation)
- Case study:Medmerry Managed Realignment Scheme + (Built new sea defences inland then breached original shingle bank)
- Case study:Pymmes Park Wetlands + (Reedbed creation)
- Case study:Rewilding Enfield's Urban Rivers + (Creation of wetland)
- Case study:Mill Brook, Tattenhall, Cheshire + (Reedbed creation)
- Case study:Padgate Brook River Restoration - part of the Warrington FRM Scheme +
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development + (Reforestation and restoration of watercourses)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (Reforestation and restoration of watercourses)
- Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008 + (Regeneration of alluvial forests)
- Case study:Austria Upper Mur - LIFE III (LIFE03 NAT/A/000011) „Inner-Alpine river basin management – Upper River Mur - murerleben I" 2003-2007 + (Regeneration of alluvial forests)
- Case study:Austria Upper Mur - LIFE+ (LIFE+ 08 NAT A 614) „Inner-Alpine river basin management – Upper River Mur - murerleben II" 2010-2015 + (Regeneration of alluvial forests)
- Case study:LIFE Saramugo + (Minimize the impact of cattle on watercourses)
- Case study:Removing a weir and renaturalising the Iton River on the Plis industrial site in Hondouville + (Replanting of banks)
- Case study:Kirkstone Beck River Restoration + (Rejuvination of river delta)
- Case study:Timber float restorations at River Iijoki + (Remeandering)
- Case study:Nine Chalk Rivers Project - Glaven Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Stiffkey Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Gaywood Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Hun Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Ingol Catchment + (Reconnection to the riparian zone)
- Case study:Charlton St Peter A 8 + (Remeandering)
- Case study:Arnos Park - Pymmes Brook + (River naturalisation)
- Case study:River Lyvennet River Restoration Project at Maulds Meaburn, Penrith, Cumbria + (Remeandering)
- Case study:River Leith Restoration Project, Thrimby, Penrith, Cumbria + (River naturalisation)
- Case study:Emmanuel’s Common Reconnection Project + (Reinstating old channel)
- Case study:River Nar, Mileham River Restoration Project + (Remeandering)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Remeandering)
- Case study:Manor Road Park + (Remeandering)
- Case study:Allt Lorgy River Restoration + (Removal of 3 culvert pipes. Infilling of a large drainage ditch.)
- Case study:Timber float restorations at River Iijoki + (Removal of embankments)
- Case study:River Quaggy- Chinbrook meadows + (Removal of embankments)
- Case study:River Roding at Ray Lodge Park + (Removal of embankments)
- Case study:Kleblach-Side channel + (Removal of embankments)
- Case study:Restoration of Siuruanjoki River + (Removal of embankments)
- Case study:The Ciobarciu Wetland Project + (Removal of embankments)
- Case study:Rottal Burn + (Removal of embankments)
- Case study:River Restoration at Hunworth (River Glaven) + (Removal of embankments)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (Removal of embankments)
- Case study:Floodplain recreation on the Montone River at the confluence with the Rabbi Stream + (Removal of embankments)
- Case study:Sculthorpe Moor Restoration Scheme + (Removal of embankments)
- Case study:Martins River Island + (Removal of embankments)
- Case study:Lower Woodsford + (Removal of embankments)
- Case study:Elgin Flood Alleviation Scheme + (Removal of embankments)
- Case study:River Avon Restoration Project + (Removal of embankments)
- Case study:Padgate Brook River Restoration - part of the Warrington FRM Scheme + (Removal of embankments)
- Case study:Mulkear Life Project + (Protect/restore riparian zone)
- Case study:Fluvial improvement in Riera de Caldés + (Riparian planting)
- Case study:Biodiversity conservation and recovery in the river basin Asón + (Removal of exotic plants)
- Case study:Route water: environmental restoration project for tourist use + (Removal of exotic plants)
- Case study:Rinya water-system reconstruction + (Riparian planting)
- Case study:River restoration project of the stream of Vallvidrera + (Removal of exotic plants)
- Case study:River restoration project in Sella, Asturias + (Removal of sediments)
- Case study:Regeneration of the banks of the river Mape + (Removal of exotic plants)
- Case study:Restoration project in the stream of the Vall d'Horta and surrounds. Natural Park of Sant Llorenç del Munt i l'Obac. + (Removal of exotic plants)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (Removal of irrigation canals)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (Removal of exotic plants)
- Case study:Vallacuera Ravine. Removal of a dyke + (Removal of exotic plants)
- Case study:Recovery of riparian vegetation affected by fire in Canaletes River and tributaries. Horta de San Joan + (Restoring riparian vegetation)
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin + (Removal of exotic plants)
- Case study:Restoration of a section of Torrente de Can Sunyer passing through Martorelles + (Removal of exotic plants)
- Case study:Restoration project of the river area of the streams of Vallmanya and Reixac + (Removal of exotic plants)
- Case study:Restoration of a stretch of the river of Santa Coloma + (Removal of exotic plants)