Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (Protect/restore riparian zone)
- Case study:Mayesbrook Climate Change Park restoration project + (Floodplain reconnection)
- Case study:River Alt at Knowsley + (Floodplain reconnection)
- Case study:Seven Hatches + (Develop riparian forest)
- Case study:Little Waltham Meadows Back Channel creation + (Creation of backwaters)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Protection of alluvial forests by connecting existing stocks to the fluvial dynamics)
- Case study:River Marden at Calne + (Public access to the river)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-development of the area through the construction of permanent wet lentic environments.)
- Case study:Long Preston Deeps Flood Plain Project + (River naturalisation)
- Case study:Timber float restorations at River Iijoki + (Remeandering)
- Case study:Thur + (Reconnection of the alluvial forest to the active floodplain)
- Case study:River Avon at East Chisenbury + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Glaven Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Stiffkey Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Gaywood Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Hun Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Ingol Catchment + (Reconnection to the riparian zone)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Recovery)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Recovery and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment; Creation of lowland groves; Restoration of natural habitats such as wet)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Recovery and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment;)
- Case study:Guadiamar Green Corridor Project + (Recovery of dynamic river system)
- Case study:River Nene Nature Improvement Area + (Installing riverside fencing)
- Case study:Pearls in Peril LIFE+ GB Project + (Fencing)
- Case study:Manthorpe Floodplain Reconnection + (Redundant Flood Bank Removed)
- Case study:London Olympics Parklands + (Reedbed creation)
- Case study:Sheephouse Wood Mine Water Treatment Scheme + (Reedbed creation)
- Case study:Wensum River Restoration and Floodplain Enhancement + (Floodplain reconnection)
- Case study:Babbs Mill reed bed + (Reedbed creation)
- Case study:Crane Park + (Reedbed creation)
- Case study:Barn Elms Wetland Centre, South West London + (Reedbed creation)
- Case study:Yeading Brook Fields/Meadows + (Creation of wetland)
- Case study:The Barge Walk, Hampton Court + (Creation of wetland)
- Case study:River Brent at Brent Cross + (Reedbed creation)
- Case study:Essex Wharf + (Reedbed creation)
- Case study:Worcester Park + (Reedbed creation)
- Case study:Rainham Creek Tidal Sluice Removal + (Reedbed creation)
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe + (Reedbed creation)
- Case study:Fresh Wharf + (Reedbed creation)
- Case study:Channel Sea + (Reedbed creation)
- Case study:Brent Lodge Park Improvement + (Reedbed creation)
- Case study:Lidl + (Habitat creation)
- Case study:Barn Elms Sports Ground + (Reedbed creation)
- Case study:Blake Avenue, Mayes Brook + (Reedbed creation)
- Case study:Beddington Park + (Reedbed creation)
- Case study:Beverley Brook d/s of Rock’s Lane + (Tree planting)
- Case study:Hampton Court Palace + (Habitat creation)