Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Planting)
- Case study:Eden Crayfish Restoration Project + (Planting)
- Case study:River Nent: Abandoned Metal Mines + (Planting)
- Case study:Matanza-Riachuelo + (Planting)
- Case study:Friends of Bottesford Beck + (Planting)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Planting of banks)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Tree planting)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Planting of helophytes at the foot of banks)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Planting of helophytes at the foot of banks)
- Case study:Bow Brook Living Landscape + (Creation of wetland)
- Case study:Manthorpe Floodplain Reconnection + (Redundant Flood Bank Removed)
- Case study:Mulkear Life Project + (Protect/restore riparian zone)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Riparian planting)
- Case study:Ems floodplain + (Develop riparian forest)
- Case study:River Skerne- Life project + (Lowering of floodplain)
- Case study:RSPB Fowlmere Nature Reserve + (Protect/restore riparian zone)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (Protect/restore riparian zone)
- Case study:Mayesbrook Climate Change Park restoration project + (Floodplain reconnection)
- Case study:River Alt at Knowsley + (Floodplain reconnection)
- Case study:Seven Hatches + (Develop riparian forest)
- Case study:Little Waltham Meadows Back Channel creation + (Creation of backwaters)
- Case study:Austria River Mur - Strategic river management for considerations in the power and water management sector in Styria/Austria + (Protection of alluvial forests by connecting existing stocks to the fluvial dynamics)
- Case study:River Marden at Calne + (Public access to the river)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Environmental restoration of the wet ecosystem along the Ufente river + (Re-development of the area through the construction of permanent wet lentic environments.)
- Case study:Long Preston Deeps Flood Plain Project + (Reconnecting palaeo riverine features)
- Case study:Timber float restorations at River Iijoki + (Remeandering)
- Case study:Thur + (Reconnection of the alluvial forest to the active floodplain)
- Case study:River Avon at East Chisenbury + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Glaven Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Stiffkey Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Gaywood Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Babingley Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Mun Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Burn Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Hun Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Heacham Catchment + (Reconnection to the riparian zone)
- Case study:Nine Chalk Rivers Project - Ingol Catchment + (Reconnection to the riparian zone)
- Case study:INTERREG MED WETNET – Odiel Marshes Wetland Contract and Action plan + (Recovery)
- Case study:LIFE RISORGIVE – Roggia Tergola Sud + (Recovery and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment; Creation of lowland groves; Restoration of natural habitats such as wet)
- Case study:LIFE RISORGIVE – Fontane Marzare + (Recovery and arrangement of the bank vegetation with the planting of native species suitable for the resurgence environment;)
- Case study:Guadiamar Green Corridor Project + (Buffer strips)
- Case study:River Nene Nature Improvement Area + (Installing riverside fencing)
- Case study:Pearls in Peril LIFE+ GB Project + (Fencing)
- Case study:Manthorpe Floodplain Reconnection + (Redundant Flood Bank Removed)
- Case study:London Olympics Parklands + (Reedbed creation)
- Case study:Sheephouse Wood Mine Water Treatment Scheme + (Reedbed creation)
- Case study:Wensum River Restoration and Floodplain Enhancement + (Floodplain reconnection)
- Case study:Babbs Mill reed bed + (Reedbed creation)
- Case study:Crane Park + (Reedbed creation)
- Case study:Barn Elms Wetland Centre, South West London + (Reedbed creation)