Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Matanza-Riachuelo + (Planting)
- Case study:Butter Hill Phase 2 + (Large scale planting of native species)
- Case study:Logie Burn Restoration Project + (Creation of backwaters)
- Case study:River Burn, North Creake + (Livestock fencing)
- Case study:Pearls in Peril LIFE+ GB Project - River Ehen + (Tree planting)
- Case study:Glaisdale Beck Restoration Project + (Fencing)
- Case study:Resilient River + (Livestock fencing)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Local deepening)
- Case study:Long Eau (Great Eau) + (Displacement of flood defences)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Tree planting)
- Case study:Chelmer Valley Local Nature Reserve + (Lowering of embankments)
- Case study:River Avon Restoration Project + (Lowering of embankments)
- Case study:Low Stanger Floodplain Reconnection Project + (Lowering of embankments)
- Case study:Wild Wylye Phase 1 + (Lowering of floodbanks)
- Case study:Meers - Floodplain lowering + (Lowering of floodplain)
- Case study:River Skerne- Life project + (Lowering of floodplain)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (Removal of embankments)
- Case study:Elgin Flood Alleviation Scheme + (Lowering of floodplain)
- Case study:Upper Cringle Floodplain Restoration Project + (Lowering of floodplain)
- Case study:Guphill Brook Riverine Enhancement + (Creation of backwaters)
- Case study:INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract + (Maintain the South dike; Respect the natural hydrological functioning of the South basin (rain fed) to favor the installation of a vegetation characteristic of temporary low-salt marshes and vegetation of salt meadows)
- Case study:Removal of the Ver mill weir on the Sienne River + (Maintenance of riparian vegetation)
- Case study:Restoring Brent Rivers and Communities + (Restoration of pond)
- Case study:Wandle River Restoration Project: Hackbridge + (Marginal wetland berms created)
- Case study:LIFE Saramugo + (Minimize the impact of cattle on watercourses)
- Case study:Charlton St Peter A 8 + (Remeandering)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Naturalisation of shoreline and watercourse rehabilitation;)
- Case study:QUERCUS Ravensbourne + (New footpaths)
- Case study:Ladywell Fields (QUERCUS) + (New footpaths)
- Case study:Barking Creek near A13 + (New footpaths)
- Case study:Wildling the Tame + (New footpaths)
- Case study:The South Hams River Improvement Project (SHRImP) + (Fencing)
- Case study:Beam washlands + (Offline storage areas)
- Case study:Lustrum Beck Flood Alleviation Scheme: Phase 2 + (Offline storage areas)
- Case study:Guisborough Flood Alleviation Scheme + (Offline storage areas)
- Case study:Ravensbourne at Queensmead + (Park creation)
- Case study:Biomura LIFE06NAT/SI/000066 + (Partially filled river sleeves - restored and cleaned of debris)
- Case study:INTERREG MED WETNET – Memorandum of Cooperation towards a Wetland Contract for the Island of Gozo + (Plant new trees characteristic of the targeted habitats; Intense removal of Gambusia Affinis)
- Case study:River Hogsmill Restoration Project + (Planting)
- Case study:Reopening of a section of the River Bièvre in an urban environment + (Planting)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (Planting)
- Case study:Eden Crayfish Restoration Project + (Planting)
- Case study:River Nent: Abandoned Metal Mines + (Planting)
- Case study:Matanza-Riachuelo + (Planting)
- Case study:Friends of Bottesford Beck + (Planting)
- Case study:Elimination of a pond along the Erve River and conservation of the historical heritage in Sainte-Suzanne-et-Chammes + (Planting of banks)
- Case study:Creation of flood channels and restoration of exchanges between the flood plain and the low-flow channel on the Vezouze + (Tree planting)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Planting of helophytes at the foot of banks)
- Case study:Bio-engineering techniques for bank protection on the Moselle River in Villey-le-Sec + (Planting of helophytes at the foot of banks)
- Case study:Bow Brook Living Landscape + (Creation of wetland)
- Case study:Manthorpe Floodplain Reconnection + (Redundant Flood Bank Removed)
- Case study:LIFE GREENCHANGE (LIFE17 NAT/IT/000619) – Construction of green infrastructures in the Fondazione Caetani farm – Restoration of the Fosso Epitaffio + (Creation of a riparian arboreous shrubland; Planting of hygrophilous shrub species)
- Case study:Mulkear Life Project + (Protect/restore riparian zone)
- Case study:Restoration of the Charentonne in the Serquigny public garden + (Riparian planting)