Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Flood detention basin (HRB) Ickern-Mengede + (Increase water retention area)
- Case study:Norman Park Bromley. + (Floodplain reconnection)
- Case study:Knepp Rewilding Project + (Floodplain reconnection)
- Case study:Stroud Rural Sustainable Drainage Project + (Creation of natural floodwater dynamics)
- Case study:Vindel River LIFE + (Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure)
- Case study:Eden Crayfish Restoration Project + (Planting)
- Case study:River Nene Nature Improvement Area + (Installing riverside fencing)
- Case study:River Tat Restoration Scheme + (Installing riverside fencing)
- Case study:Ecclesbourne Farm project + (Installing riverside fencing)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (Installing typical temporary marshes and grassland vegetations of Mediterranean wetlands.)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Creation of a flood expansion area)
- Case study:Dove Weir removal + (Cut back of trees)
- Case study:ReNaturalize + (Introducing large woody debris)
- Case study:Castle Irwell Urban Wetland + (Introducing large woody debris)
- Case study:Letting the Dove Flow 2 + (Improvement of natural flows)
- Case study:Isar-Plan + (Large scale planting of native species)
- Case study:Inchewan Burn Bed restoration + (Removal of non-native species)
- Case study:River Gaywood – Seven Sisters Drain + (Vegetation management)
- Case study:Matanza-Riachuelo + (Planting)
- Case study:Butter Hill Phase 2 + (Large scale planting of native species)
- Case study:Logie Burn Restoration Project + (Creation of backwaters)
- Case study:River Burn, North Creake + (Livestock fencing)
- Case study:Pearls in Peril LIFE+ GB Project - River Ehen + (Tree planting)
- Case study:Glaisdale Beck Restoration Project + (Fencing)
- Case study:Resilient River + (Livestock fencing)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Local deepening)
- Case study:Long Eau (Great Eau) + (Displacement of flood defences)
- Case study:Charlton St Peter A 8 + (Remeandering)
- Case study:2e Lower Woodsford River and Floodplain Enhancement + (Tree planting)
- Case study:Chelmer Valley Local Nature Reserve + (Lowering of embankments)
- Case study:River Avon Restoration Project + (Lowering of embankments)
- Case study:Low Stanger Floodplain Reconnection Project + (Lowering of embankments)
- Case study:Meers - Floodplain lowering + (Lowering of floodplain)
- Case study:Wild Wylye Phase 1 + (Lowering of floodbanks)
- Case study:River Skerne- Life project + (Lowering of floodplain)
- Case study:Floodplain recreation on the Montone River at San Tomè (Forlì) + (Removal of embankments)
- Case study:Elgin Flood Alleviation Scheme + (Lowering of floodplain)
- Case study:Upper Cringle Floodplain Restoration Project + (Lowering of floodplain)
- Case study:Guphill Brook Riverine Enhancement + (Creation of backwaters)
- Case study:INTERREG MED WETNET - Membership card of the Verdier Marshes-Rhone Delta Wetland Contract + (Maintain the South dike; Respect the natural hydrological functioning of the South basin (rain fed) to favor the installation of a vegetation characteristic of temporary low-salt marshes and vegetation of salt meadows)
- Case study:Removal of the Ver mill weir on the Sienne River + (Maintenance of riparian vegetation)
- Case study:Restoring Brent Rivers and Communities + (Restoration of pond)
- Case study:Wandle River Restoration Project: Hackbridge + (Marginal wetland berms created)
- Case study:LIFE Saramugo + (Minimize the impact of cattle on watercourses)
- Case study:LakeAdmin - Chadwick lakes - Plan to improve the surface water quality and reservoir restoration in the Chadwick lakes area + (Naturalisation of shoreline and watercourse rehabilitation;)
- Case study:QUERCUS Ravensbourne + (Buffer strips)
- Case study:Ladywell Fields (QUERCUS) + (Creation of backwaters)
- Case study:Barking Creek near A13 + (New footpaths)
- Case study:Wildling the Tame + (New footpaths)
- Case study:The South Hams River Improvement Project (SHRImP) + (Fencing)
- Case study:Beam washlands + (Offline storage areas)