Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Eau Blanche River (Walphy - LIFE project) + (Habitat diversification)
- Case study:Tichborne River Restoration Project + (Habitat diversification)
- Case study:New Forest Life III project + (Habitat diversification)
- Case study:River Hogsmill Restoration Project + (Planting)
- Case study:Wilmer Way School Playing Field + (Habitat enhancement)
- Case study:Wealdstone Brook + (Habitat enhancement)
- Case study:Rainham Marshes + (Habitat enhancement)
- Case study:Medmerry Managed Realignment Scheme + (Built new sea defences inland then breached original shingle bank)
- Case study:River Nent: Abandoned Metal Mines + (Planting)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (Habitat enhancement)
- Case study:Pearls in Peril LIFE+ GB Project - River Spey + (Habitat enhancement)
- Case study:The Pentney Restoration Project + (Habitat creation)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (Habitat enhancement)
- Case study:Love My River + (Habitat enhancement)
- Case study:Swindale Beck Restoration + (Adding sinuosity)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of wetland)
- Case study:Restoration of the stream of the Partido + (Habitat restoration)
- Case study:Recovery of the functionality of Brazo de la Torre + (Habitat restoration)
- Case study:Recovery "CañoTravieso" + (Habitat restoration)
- Case study:LIFE08NAT/IT/000352 CRAINat + (Habitat restoration)
- Case study:Mayesbrook Climate Change Park restoration project + (Floodplain reconnection)
- Case study:River Little Ouse at Thetford + (Creation of backwaters)
- Case study:Comal River Restoration + (Habitat restoration)
- Case study:Salzano wetland and Marzenego river restoration project + (Hydraulic connection between the river and an outflow wetland)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Implantation of amphibian ponds)
- Case study:VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) + (Implementation of functional and demonstrative actions for ecological restoration of riverine and riverine habitats)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Improve longitudinal connectivity)
- Case study:South Calder Water deculverting and habitat restoration + (Deculverting)
- Case study:Bocq river (Walphy - LIFE project) + (Creation of fish spawn nursing places)
- Case study:Letting the Dove Flow 2 + (Improvement of natural flows)
- Case study:Kentchurch Weir Removal + (Improving fish migration)
- Case study:Diffusing the Issue in Rural Ribble - River Loud + (Improving fish migration)
- Case study:Source to Sea Programme + (Improving fish migration)
- Case study:Source to Sea Programme – 2. Pan-Morecambe Bay Wetlands and Waterbodies Restoration + (Improving fish migration)
- Case study:Source to Sea Programme – 9. Kent, Leven and Duddon Estuaries beach cleans and volunteer ambassadors + (Improving fish migration)
- Case study:Bell Green Weir fish passage + (Improving fish migration)
- Case study:Avon Barriers Project + (Improving fish migration)
- Case study:Avon Barriers Project: Ferengair Weir + (Improving fish migration)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (Improving fish migration)
- Case study:LIFE Segura Riverlink (Through rivers) + (Improving fish migration)
- Case study:Habitat improvement measures in Bortneelva + (Improving fish migration)
- Case study:Morava restoration project + (Dyke relocation)
- Case study:Wummewiesen restoration project + (Extensive planting)
- Case study:Millingerwaard-Floodplain rehabilitation + (Riparian planting)
- Case study:Upper Emscher + (Increase water retention area)
- Flood detention basin (HRB) Ickern-Mengede + (Increase water retention area)
- Case study:Norman Park Bromley. + (Floodplain reconnection)
- Case study:Knepp Rewilding Project + (Floodplain reconnection)
- Case study:Stroud Rural Sustainable Drainage Project + (Creation of natural floodwater dynamics)
- Case study:Vindel River LIFE + (Increases the interaction between land and water and the heterogeneity of the substrate; vegetation and shore structure)
- Case study:Eden Crayfish Restoration Project + (Planting)
- Case study:River Nene Nature Improvement Area + (Installing riverside fencing)
- Case study:River Tat Restoration Scheme + (Installing riverside fencing)
- Case study:Ecclesbourne Farm project + (Installing riverside fencing)
- Case study:Restoration of the Cassaire wetland (Rhôle delta) + (Installing typical temporary marshes and grassland vegetations of Mediterranean wetlands.)
- Case study:Holnicote multi-objective flood risk management demonstration project + (Creation of a flood expansion area)
- Case study:Dove Weir removal + (Cut back of trees)
- Case study:ReNaturalize + (Introducing large woody debris)
- Case study:Castle Irwell Urban Wetland + (Introducing large woody debris)
- Case study:Letting the Dove Flow 2 + (Improvement of natural flows)
- Case study:Isar-Plan + (Large scale planting of native species)