Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Increased biodiversity, river Llobregat, Sallent. + (Silvicultural treatments)
- Case study:Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water + (Creation of an infiltration lagoon)
- Case study:Fluvial river restoration of Tordera in Sant Celoni + (Riparian planting)
- Case study:Fluvial river restoration of Tordera in Tordera + (Habitat creation)
- Case study:Vallacuera Ravine. Removal of a dyke + (Removal of exotic plants)
- Case study:Restoration of riparian zone in Aragon River + (Habitat creation)
- Case study:River Little Ouse at Thetford + (Creation of backwaters)
- Case study:Lewisham College weir + (Habitat creation)
- Case study:The Barge Walk, Hampton Court + (Creation of wetland)
- Case study:Beverley Park + (Habitat creation)
- Case study:Hurst Park + (Habitat creation)
- Case study:Weir Road + (Habitat creation)
- Case study:Springfield Marina + (Habitat creation)
- Case study:Lullingstone Castle phase 2 + (Habitat creation)
- Case study:Lidl + (Habitat creation)
- Case study:Hampton Court Palace + (Habitat creation)
- Case study:Mill Green + (Creation of wetland)
- Case study:Thamesmead Canal Corridor Masterplan + (Habitat creation)
- Case study:Cumbria River Restoration Program - Whitbeck restoration project - West Cumbria + (River channel diversion)
- Case study:The Pentney Restoration Project + (Habitat creation)
- Case study:West Amesbury + (Wetland restoration)
- Case study:Bourne End Recreation Ground River Enhancement Project + (Habitat creation)
- Case study:Castle Irwell Urban Wetland + (Introducing large woody debris)
- Case study:Healthy Rivers + (Barrier removal)
- Case study:Nursery habitat for the freshwater pearl mussel in Haukåsvassdraget + (Creation of side channel)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Eau Blanche River (Walphy - LIFE project) + (Habitat diversification)
- Case study:Tichborne River Restoration Project + (Habitat diversification)
- Case study:New Forest Life III project + (Habitat diversification)
- Case study:River Hogsmill Restoration Project + (Planting)
- Case study:Wilmer Way School Playing Field + (Habitat enhancement)
- Case study:Wealdstone Brook + (Habitat enhancement)
- Case study:Rainham Marshes + (Habitat enhancement)
- Case study:Medmerry Managed Realignment Scheme + (Built new sea defences inland then breached original shingle bank)
- Case study:River Nent: Abandoned Metal Mines + (Planting)
- Case study:Guash Habitat Restoration Project (Phase 1 and 2) + (Habitat enhancement)
- Case study:Pearls in Peril LIFE+ GB Project - River Spey + (Habitat enhancement)
- Case study:The Pentney Restoration Project + (Habitat creation)
- Case study:Blackwater River Habitat Enhancements & Fish Passage + (Habitat enhancement)
- Case study:Love My River + (Habitat enhancement)
- Case study:Swindale Beck Restoration + (Adding sinuosity)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of wetland)
- Case study:Restoration of the stream of the Partido + (Habitat restoration)
- Case study:Recovery of the functionality of Brazo de la Torre + (Habitat restoration)
- Case study:Recovery "CañoTravieso" + (Habitat restoration)
- Case study:LIFE08NAT/IT/000352 CRAINat + (Habitat restoration)
- Case study:Mayesbrook Climate Change Park restoration project + (Floodplain reconnection)
- Case study:River Little Ouse at Thetford + (Creation of backwaters)
- Case study:Comal River Restoration + (Habitat restoration)
- Case study:Salzano wetland and Marzenego river restoration project + (Hydraulic connection between the river and an outflow wetland)
- Case study:Bird reserve “Las Marismas Blancas” (Cantabria) + (Implantation of amphibian ponds)
- Case study:VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço) + (Implementation of functional and demonstrative actions for ecological restoration of riverine and riverine habitats)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. + (Improve longitudinal connectivity)