Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Wummewiesen restoration project + (Extensive planting)
- Case study:Pymmes Park Wetlands + (Reedbed creation)
- Case study:Firs Farm Wetlands + (Creation of wetland)
- Case study:River Cleddau + (Fencing)
- Case study:Logie Burn Restoration Project + (Creation of backwaters)
- Case study:The South Hams River Improvement Project (SHRImP) + (Fencing)
- Case study:The Dart and Teign River Improvement Project (DTRIP) + (Fencing)
- Case study:Houghton 'trout stream' enhancements + (Fencing)
- Case study:Strategic Framework for Restoration of the River Avon (SFfRRA) + (Fencing)
- Case study:Pearls in Peril LIFE+ GB Project + (Fencing)
- Case study:Bow Brook Living Landscape + (Creation of wetland)
- Case study:Chase Nature Reserve + (Fencing)
- Case study:Diffusing the Issue in rural Ribble - Skirden Beck + (Tree planting)
- Case study:Diffusing the Issue in rural Ribble - Easington + (Tree planting)
- Case study:Diffusing the Issue in rural Ribble - Stock Beck + (Tree planting)
- Case study:Source to Sea Programme – 11. River Rawthey + (Tree planting)
- Case study:River Meden response to diffuse pollution + (Fencing)
- Case study:Glaisdale Beck Restoration Project + (Fencing)
- Case study:Upper River Witham : Easton + (Fencing)
- Case study:River Witham Great Ponton + (Fencing)
- Case study:Source to Sea Programme + (Creation of wetland)
- Case study:Source to Sea Programme – 4. River Kent tributaries + (Fencing of riparian zone)
- Case study:Source to Sea Programme – 8. River Keer Restoration + (Fencing of riparian zone)
- Case study:Source to Sea Programme – 3. Upper Wenning Restoration + (Fencing of riparian zone)
- Case study:Ddu Restoration Project + (Fencing of riparian zone)
- Case study:LIFE REWETLAND - A wide-area programme for improving the quality of surface water in the agro pontino by means of natural purification techniques + (Filter ecosystem in the Circeo National Park; Buffer strips along the reclamation canals)
- Case study:Diffusing the Issue in rural Ribble + (Barrier removal)
- Case study:Albany Park + (River naturalisation)
- Case study:Diffusing the Issue in rural Ribble - Swanside + (Barrier removal)
- Case study:River Don Restoration project + (Fish passage improvements)
- Case study:Manthorpe Floodplain Reconnection + (Redundant Flood Bank Removed)
- Case study:PROGETTO WETLAND - Volturno + (Floodplain creation)
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels + (Floodplain creation)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Floodplain creation)
- Case study:Eddleston water + (Floodplain creation)
- Case study:Zero river restoration project + (Floodplain creation)
- Case study:Scolo Desolino restoration project + (Floodplain creation)
- Case study:Rio Sant'Ambrogio restoration project + (Floodplain creation)
- Case study:Pymmes Park Wetlands + (Floodplain creation)
- Case study:Firs Farm Wetlands + (Floodplain creation)
- Case study:Castle Irwell Urban Wetland + (Floodplain creation)
- Case study:Mayes Brook River Restoration, Mayesbrook Park, East London + (Floodplain creation)
- Case study:Mill Brook, Tattenhall, Cheshire + (Floodplain creation)
- Case study:Belton Floodplain Reconnection and River Restoration + (Floodplain lowering)
- Case study:River Wid restoration scheme + (Floodplain reconnection)
- Case study:Renaturierung Untere Havel + (Floodplain reconnection)
- Case study:New Forest LIFE project + (Floodplain reconnection)
- Case study:Rother meander reconnection + (Floodplain reconnection)
- Case study:Lippeaue Klostermersch + (Floodplain reconnection)
- Case study:Lower Aurino river: Molini di Tures riverbed widening + (Floodplain reconnection)
- Case study:Braid Burn at Inch Park + (Floodplain reconnection)
- Case study:Short Heath Brook Project + (Floodplain reconnection)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Floodplain reconnection)
- Case study:Lower Aurino river: Gatzaue riverbed widening + (Floodplain reconnection)
- Case study:Rottal Burn + (Floodplain reconnection)
- Case study:Malltraeth Marsh + (Creation of wetland)
- Case study:Mayesbrook Climate Change Park restoration project + (Floodplain reconnection)
- Case study:Flood channel creation and reconnection between riverbed and its floodplain on Vezouze river + (Floodplain reconnection)
- Case study:Lower Aurino river: San Giorgio di Brunico riverbed widening + (Floodplain reconnection)
- Case study:Zero river restoration project + (Floodplain reconnection)
- Case study:Scolo Desolino restoration project + (Floodplain reconnection)
- Case study:Rio Sant'Ambrogio restoration project + (Floodplain reconnection)