Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Lee Navigation by Walthamstow Marshes + (Creation of wetland)
- Case study:Wandle Valley Wetlands + (Creation of wetland)
- Case study:Mill Green + (Creation of wetland)
- Case study:Watford FC / Hospital + (Creation of wetland)
- Case study:Yeading Brook fields - Reedbed creation + (Creation of wetland)
- Case study:Ladywell Fields Phase 2 + (Creation of wetland)
- Case study:Salmons Brook Flood Alleviation Scheme, Montagu Recreation Ground site + (Creation of wetland)
- Case study:Bocking Blackwater River Restoration + (Erosion protection)
- Case study:Martins River Island + (Creation of wetland)
- Case study:Ironbridge Farm + (Creation of backwaters)
- Case study:Elgin Flood Alleviation Scheme + (Lowering of floodplain)
- Case study:Upper Mun Restoration: Frogshall Wetland Project + (Creation of wetland)
- Case study:Pymmes Park Wetlands + (Reedbed creation)
- Case study:Firs Farm Wetlands + (Creation of wetland)
- Case study:Rewilding Enfield's Urban Rivers + (Creation of wetland)
- Case study:Soaring connections: restoring people, wildlife & place + (Creation of wetland)
- Case study:Community Wetlands + (Creation of wetland)
- Case study:Aménagement du plan d’eau de la Sangsue et création d’un bras de contournement du Woigot + (Remeandering)
- Case study:River Hogsmill Restoration Project + (Planting)
- Case study:Dove Weir removal + (Cut back of trees)
- Case study:Revitalisation of branch ’Felsőszentmártoni’ at River Dráva + (Cut back of trees)
- Case study:The South Hams River Improvement Project (SHRImP) + (Fencing)
- Case study:Improving the Conservation Status of Freshwater Pearl Mussel Targeting the Clun SAC and Upstream Waters + (Riparian habitat restoration)
- Case study:Beverley Park + (Habitat creation)
- Case study:Gategill Beck: Abandoned Metal Mines + (Dam lowering)
- Case study:Recovery of the functionality of Brazo de la Torre + (Habitat restoration)
- Case study:Beekherstel Lactariabeek + (Dead wood deposition)
- Case study:Telford Catchment Restoration Project + (Decrease sedimentation)
- Case study:South Calder Water deculverting and habitat restoration + (Deculverting)
- Case study:The Rivers Return; Restoring the Kirklees Brook, River Irwell + (Deculverting)
- Case study:Pymmes Park Wetlands + (Deculverting)
- Case study:Firs Farm Wetlands + (Deculverting)
- Case study:Reopening the River Roch in Rochdale and Reducing Flood Risk + (Deculverting)
- Case study:Lowdham NFM + (Deculverting)
- Case study:Agreed definition of mobility area for the Adour + (Develop riparian forest)
- Case study:Langonnet river + (Develop riparian forest)
- Case study:Ems floodplain + (Develop riparian forest)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora) + (Develop riparian forest)
- Case study:Conservation strategies for forest and wild river in Gesaeuse: the River Enns restoration + (Creation of pond)
- Case study:Seven Hatches + (Develop riparian forest)
- Case study:Aesthetic vs. functional restoration of urban and peri-urban rivers: the Manzanares River in Madrid + (Reforestation and restoration of watercourses)
- Case study:Sediment Pathways Project + (Disconnecting prime sources of diffuse sediment from the waterways)
- Case study:Long Eau (Great Eau) + (Displacement of flood defences)
- Case study:Rams Brewery + (Displacement of flood defenses)
- Case study:Restoration in the lower reach of the Cinca River + (Displacement of flood defenses)
- Case study:Swindale Beck Restoration + (Adding sinuosity)
- Case study:Beekherstel Buurserbeek + (Dood hout inbreng)
- Case study:Beekherstel Leerinkbeek + (Dood hout inbreng)
- Case study:Beekherstel Ramsbeek + (Dood hout inbreng)
- Case study:Medmerry Managed Realignment Scheme + (Built new sea defences inland then breached original shingle bank)
- Case study:Morava restoration project + (Dyke relocation)
- Case study:Environmental Restoration of Olivar-El Zaudin Metropolitan Park in Tomares + (Elimination of allochthonous plant species)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental) + (Removal of irrigation canals)
- Case study:Restoration project in Turia River + (Removal of exotic plants)
- Case study:Restoration project in Verde River + (Removal of exotic plants)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (Planting of helophytes at the foot of banks)