Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Bidasoa Dam removal 2 + (Barrier removal)
- Case study:Belton Floodplain Reconnection and River Restoration + (Floodplain lowering)
- Case study:Upper Witham Restoration + (Bed raising)
- Case study:Beekherstel Keersop + (Beschaduwing)
- Case study:Herinrichting Beekloop + (Beschaduwing)
- Case study:Deculverting Djupsund stream + (Bigger diameter pipe under way)
- Case study:Cornmill Gardens (QUERCUS) + (Buffer strips)
- Case study:QUERCUS Ravensbourne + (Buffer strips)
- Case study:PROGETTO WETLAND - Volturno + (Excavation for floodplain creation)
- Case study:Restoration of Ingarskilanjoki River + (Buffer strips)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Floodplain reconnection)
- Case study:Guadiamar Green Corridor Project + (Buffer strips)
- Case study:Zero river restoration project + (Floodplain reconnection)
- Case study:Scolo Desolino restoration project + (Floodplain reconnection)
- Case study:Rio Sant'Ambrogio restoration project + (Floodplain reconnection)
- Case study:Source to Sea Programme – 10. River Gilpin, Foulshaw and Winster Restoration + (Creation of wet woodland)
- Case study:Source to Sea Programme – 11. River Rawthey + (Tree planting)
- Case study:Peffery Project Phase 3 + (Riparian planting)
- Case study:Prologis Midpoint Park river restoration scheme + (Creation of a flood expansion area)
- Case study:River Idle Restoration Project + (Buffer strips)
- Case study:Dorset CPAF Projects + (Buffer strips)
- Case study:Glaisdale Beck Restoration Project + (Fencing)
- Case study:Castle Irwell Urban Wetland + (Introducing large woody debris)
- Case study:Medmerry Managed Realignment Scheme + (Built new sea defences inland then breached original shingle bank)
- Case study:Land opposite Wanstead Park + (Bund removal)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Stage 0 channel restoration + (Barrier removal)
- Case study:Buiten Ooij + (Water release into floodplain in winter)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Complete conversion to a natural layout of the riparian strip of the Ninfa River; completion of the planting of plants)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Riparian planting)
- Case study:Vallacuera Ravine. Removal of a dyke + (Removal of exotic plants)
- Case study:River Kennet Restoration at Durnsford + (Connection to wider floodplain)
- Case study:River Glaven conservation group + (Connection to wider floodplain)
- Case study:Regelsbrunner Aue + (Connection to wider floodplain)
- Case study:Lippeaue Klostermersch + (Connection to wider floodplain)
- Case study:River Avon Stream project + (Connection to wider floodplain)
- Case study:Eddleston water + (Connection to wider floodplain)
- Case study:Upper Emscher + (Connection to wider floodplain)
- Case study:Tall River + (Connection to wider floodplain)
- Flood detention basin (HRB) Ickern-Mengede + (Connection to wider floodplain)
- Case study:Nine Chalk Rivers Project + (Connection to wider floodplain)
- Case study:Whit Beck River Restoration Project + (Connection to wider floodplain)
- Case study:River Glyme Stratford Restoration + (Connection to wider floodplain)
- Case study:Tichborne River Restoration Project + (Connection to wider floodplain)
- Case study:Bidasoa Dam removal 2 + (Connection to wider floodplain)
- Case study:Stage 0 channel restoration + (Connection to wider floodplain)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (Conservation measures and environmental improvement)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Harbertonford Flood Alleviation Scheme + (Containment bund to prevent flooding)
- Case study:Lodge Burn Flood Alleviation Scheme + (Construction of flood wall)
- Case study:River Valency at Boscastle + (Construction of flood wall)
- Case study:Restoration of dry riverbeds in Røssåga in conjunction with relocation of power plant outlets + (Construction of flood wall)
- Case study:Vén-Duna (Old-Danube) sidearm’s revitalization + (Construction of new sluices)
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica + (Local deepening)
- Case study:Diversion of the River Nith + (Containment bund to prevent flooding)
- Case study:Lowdham NFM + (Containment bund to prevent flooding)
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 + (Control of invasive species)
- Case study:Natura 2000conservation in Alta Tuscia Viterbese LIFE04 NAT/IT/000153 + (Control of invasive species)
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River + (Revetmens with local species)
- Case study:Llobregat river restoration + (Riparian planting)
- Case study:River Wandle Restoration Project + (Control of invasive species)
- Case study:Conservation of alluvial + (Control of invasive species)
- Case study:Bow Brook Living Landscape + (Creation of wetland)
- Case study:The Middle Ouse Restoration of Physical Habitats (MORPH) + (Creation of wet woodland)