Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Herinrichting Beekloop + (Beschaduwing)
- Case study:Deculverting Djupsund stream + (Bigger diameter pipe under way)
- Case study:Cornmill Gardens (QUERCUS) + (Buffer strips)
- Case study:QUERCUS Ravensbourne + (Buffer strips)
- Case study:PROGETTO WETLAND - Volturno + (Excavation for floodplain creation)
- Case study:Restoration of Ingarskilanjoki River + (Buffer strips)
- Case study:Rio San Martino and Piovega di Scandolara restoration project + (Floodplain reconnection)
- Case study:Guadiamar Green Corridor Project + (Buffer strips)
- Case study:Zero river restoration project + (Floodplain reconnection)
- Case study:Scolo Desolino restoration project + (Floodplain reconnection)
- Case study:Rio Sant'Ambrogio restoration project + (Floodplain reconnection)
- Case study:Source to Sea Programme – 10. River Gilpin, Foulshaw and Winster Restoration + (Creation of wet woodland)
- Case study:Source to Sea Programme – 11. River Rawthey + (Tree planting)
- Case study:Peffery Project Phase 3 + (Riparian planting)
- Case study:Prologis Midpoint Park river restoration scheme + (Creation of a flood expansion area)
- Case study:River Idle Restoration Project + (Buffer strips)
- Case study:Dorset CPAF Projects + (Buffer strips)
- Case study:Glaisdale Beck Restoration Project + (Fencing)
- Case study:Castle Irwell Urban Wetland + (Introducing large woody debris)
- Case study:Medmerry Managed Realignment Scheme + (Built new sea defences inland then breached original shingle bank)
- Case study:Land opposite Wanstead Park + (Bund removal)
- Case study:Upper River Nairn restoration project + (Channel realignment)
- Case study:Broadwater Brook + (Channel realignment)
- Case study:Stage 0 channel restoration + (Channel realignment)
- Case study:Buiten Ooij + (Water release into floodplain in winter)
- Case study:Restoration of the Pantanello wetland area (Fondazione Caetani) + (Complete conversion to a natural layout of the riparian strip of the Ninfa River; completion of the planting of plants)
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid) + (Riparian planting)
- Case study:Vallacuera Ravine. Removal of a dyke + (Removal of exotic plants)
- Case study:River Kennet Restoration at Durnsford + (Connection to wider floodplain)
- Case study:River Glaven conservation group + (Connection to wider floodplain)
- Case study:Regelsbrunner Aue + (Connection to wider floodplain)
- Case study:Lippeaue Klostermersch + (Floodplain reconnection)
- Case study:River Avon Stream project + (Creation of wetland)
- Case study:Eddleston water + (Connection to wider floodplain)
- Case study:Upper Emscher + (Increase water retention area)
- Case study:Tall River + (Connection to wider floodplain)
- Flood detention basin (HRB) Ickern-Mengede + (Increase water retention area)
- Case study:Nine Chalk Rivers Project + (Connection to wider floodplain)
- Case study:Whit Beck River Restoration Project + (Connection to wider floodplain)
- Case study:River Glyme Stratford Restoration + (Connection to wider floodplain)
- Case study:Tichborne River Restoration Project + (Habitat diversification)
- Case study:Bidasoa Dam removal 2 + (Barrier removal)
- Case study:Stage 0 channel restoration + (Barrier removal)
- Case study:INTERREG MED WETNET – Management Plan for the Cañizar Lagoon (ARAGON) + (Conservation measures and environmental improvement)
- Case study:Broadwater Brook +
- Case study:Harbertonford Flood Alleviation Scheme + (Containment bund to prevent flooding)
- Case study:Lodge Burn Flood Alleviation Scheme + (Construction of flood wall)
- Case study:River Valency at Boscastle + (Construction of flood wall)