Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- East +
- North +
- South +
- West +
- Case study:Mulkear Life Project +
- Case study:River Hogsmill Restoration Project +
- Case study:River Ebbw Bank Stabilisation +
- Case study:Cornmill Gardens (QUERCUS) +
- Case study:QUERCUS Ravensbourne +
- Case study:Restoration of the surface flows of two temporary tributaries of the upstream Clauge +
- Case study:Refilling the meanders of the Colostre +
- Case study:Removal of Maisons-Rouges dam over the River Vienne +
- Case study:Removal of five Lakes on the Val des Choues stream +
- Case study:Removal of the Kernansquillec dam over the River Léguer +
- Case study:Restoring the River Doquette to its original bed +
- Case study:Agreed definition of mobility area for the Adour +
- Case study:Reopening of a section of the River Bièvre in an urban environment +
- Case study:River Wid restoration scheme +
- Case study:Removal of twenty small structures and diversification of the Main Channel of the River Couasnon +
- Case study:Chiese river upstream Idro lake – Trentino region +
- Case study:Valtellina 2005 – New green system +
- Case study:PROGETTO WETLAND - Volturno +
- Case study:San Giovanni stream restoration upstream San Matteo della Decima +
- Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572 +
- Case study:Ritobäcken-environmentally preferable two-stage drainage channels +
- Case study:Restoration of Myllypuro brook +
- Case study:Vindel River LIFE +
- Case study:Biologisk återställning i Rolfsåns vattensystem +
- Case study:Silverån övre +
- Case study:Timber float restorations at River Iijoki +
- Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM +
- Case study:RESTORATION OF THE TRESENEC STREAM +
- Case study:HPP Blanca +
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA +
- Case study:River Cleddau +
- Case study:Biomura LIFE06NAT/SI/000066 +
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica +
- Case study:Creation and restoration of a riparian zone +
- Case study:Restoration in river Tajo and tributaries after kaolin spillage +
- Case study:Fluvial improvement in Riera de Caldés +
- Case study:Demolition of weir on the River Nora, Nalón Basin +
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia ) +
- Case study:Biodiversity conservation and recovery in the river basin Asón +
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain +
- Case study:Weir demolition in river Nansa, Cantabria +
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos +
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage. +
- Case study:Fluvial restoration in River Carrión +
- Case study:SCI Parga-Ladra-Támoga: recovery of bog woodland and dystrophic lake +
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba) +