Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Case study:Austria cross-border section - Monitoring sediment transport and Habitat modelling (ETZ-Project “DraMurCi” 2009-2013) + (January 1, 2009)
- Case study:Bocq river (Walphy - LIFE project) + (January 1, 2009)
- Case study:Eau Blanche River (Walphy - LIFE project) + (January 1, 2009)
- Case study:River Ouse at Sharpsbridge Rock Ramp Fish Easement Project + (January 1, 2009)
- Case study:Bio-engineering and creation of side channels along the rectified section of the Scarpe River in Arras + (January 1, 2009)
- Case study:River Glaven, North Norfolk + (2009)
- Case study:Slowing the Flow at Pickering + (2009)
- Case study:LIFE+ Traisen + (January 1, 2009)
- Case study:Restoration and conservation of riparian forests - habitats of European conservation importance on the territory of Dimitrovgrad municipality + (February 1, 2009)
- Case study:Fluvial improvement in Riera de Caldés + (March 1, 2009)
- Case study:Remediation and revitalization of Séd-Nádor stream + (March 1, 2009)
- Case study:River Restoration at Hunworth (River Glaven) + (March 1, 2009)
- Case study:Holnicote multi-objective flood risk management demonstration project + (April 1, 2009)
- Case study:Restoration of Enningdalsälv River + (June 1, 2009)
- Case study:Highland Water at Warwickslade Lawn + (June 1, 2009)
- Case study:Works of improvement in final stretch of the Riera of Vallcorba, Sant Quirze del Vallès + (June 1, 2009)
- Case study:Restoration of the stream of Vallicrosa in the section of the source of Pic + (June 1, 2009)
- Case study:Saltburn Gill ironstones mines + (July 1, 2009)
- Case study:Démantèlement de neuf ouvrages sur le cours de l’Aa + (July 1, 2009)
- Case study:Restoration, protection and sustainable development of protected area "Zlato pole" + (August 1, 2009)
- Case study:Mains of Dyce + (August 1, 2009)
- Case study:Effacement partiel du seuil Cros sur la Dunière + (August 1, 2009)
- Case study:Water is Environmental Pearl (WEP) - SLO-HU ETE 2007-2013 + (September 1, 2009)
- Case study:European Fisheries Fund + (September 1, 2009)
- Case study:Effacement partiel de 14 seuils sur le Mutterbach et l’Hosterbach à Holving et Hoste + (September 1, 2009)
- Case study:Dérivation et recréation du lit mineur du ruisseau de Bel Orient au droit de quatre plans d’eau à Gueltas + (September 1, 2009)
- Case study:Reméandration du Geer à Grand-Axhe + (September 30, 2009)
- Case study:River Kennet Restoration at Durnsford + (October 1, 2009)
- Case study:Sowe Valley Project + (October 1, 2009)
- Case study:Arasement du seuil des Treize Saules sur la Quilienne + (October 1, 2009)
- Case study:Effacement partiel de cinq seuils sur le ruisseau du Bagas + (October 1, 2009)
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain + (November 1, 2009)
- Case study:River restoration project in Congost between the torrent of Malhivern and end of the municipality of La Garriga + (November 1, 2009)
- Case study:Environmental regeneration project in Magro river bed + (November 1, 2009)
- Case study:Vindel River LIFE + (January 1, 2010)
- Case study:Weir demolition in river Nansa, Cantabria + (January 1, 2010)
- Case study:Route water: environmental restoration project for tourist use + (January 1, 2010)
- Case study:Riparia-Ter - Recovery of riparian habitats of the Ter River + (January 1, 2010)
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor + (January 1, 2010)
- Case study:LIFE08NAT/IT/000352 CRAINat + (January 1, 2010)
- Case study:Pickering Beck & Dutchy Water improvement project + (January 1, 2010)
- Case study:Lea Bridge Waterway Wall Improvements + (January 1, 2010)
- Case study:Brent River Park Phase II + (January 1, 2010)
- Case study:EDF Weir removal + (January 1, 2010)
- Case study:Fishery/habitat enhancement on the Grand Union Canal + (January 1, 2010)
- Case study:Chertsey meads + (January 1, 2010)
- Case study:Valentines Park + (January 1, 2010)
- Case study:Plough Lane weir removal + (January 1, 2010)
- Case study:River Shuttle Enhancement Works - Love Lane + (January 1, 2010)
- Case study:Merton Abbey Mills Eel Pass + (January 1, 2010)
- Case study:Rainham Marshes + (January 1, 2010)
- Case study:River Shuttle Enhancement Works - Malborough Park + (January 1, 2010)
- Case study:Big Yellow + (January 1, 2010)
- Case study:Ravensbury Park back channel + (January 1, 2010)